SCP-5258
Thaumiel
~
medium confidence
SCP-5258
Expected annual
$24.6M
One-time setup
$20.2M
Annual recurring
$24.1M
Personnel
48
One-time containment buildouts are ~20.2M USD (vaults, lab, and technical one-offs); annual operating costs are ~24.1M USD driven by specialist staff, security, contingency reserves and covert/cover budgets.
One-Time Capital Costs
Total: $20.2M
Annual Recurring Costs
Total: $24.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$24.1M/yr
Normal year with no major incidents; routine operations, research, security and reserves funded.
no leaks
routine operations
scheduled research and maintenance
🚨
Minor Incident
$25.1M/yr
Limited leak or exposed copy requiring takedown, incident response and targeted remediation.
isolated leak
small-scale public exposure
targeted covert takedown
🚨
Major Breach
$49.1M/yr
Widespread exposure or compromise requiring large-scale public health response, legal action, mass containment and major covert/cover operations.
mass public exposure
multi-jurisdiction legal fallout
large-scale casualty response
Personnel
48 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Memetics Scientist | 6 | [#5] Senior memeticists and cognitive scientists for device development and research. |
| Security Officer / MTF Agent | 24 | [#6] 24/7 armed security across two sites (rotation to prevent insider threat). |
| IT / Cybersecurity | 4 | [#7] Operators and embedded-systems specialists maintaining air-gapped infrastructure. |
| Forensic Analyst / Incident Responder | 4 | [#11] Rapid-deployment forensic teams and technical sanitization staff. |
| Medical Officer | 4 | [#12] On-call neuro/critical-care and medical monitoring personnel. |
| Legal Counsel / Administrative Staff | 2 | [#9] In-house counsel and administrative support for policy, cover stories and oversight coordination. |
| Engineer / Maintenance | 2 | [#1, #15] Facility engineers for vault systems, environmental controls and robotic ports. |
| Training / Compliance Officer | 2 | [#14, #26] Training delivery, SOP maintenance and audit coordination staff. |
Confidence Notes
Estimates are based on analyst ranges and typical procurement/salary assumptions; many line items are wide ranges (contingency, covert ops, catastrophic reserve) so uncertainty remains in final totals.