SCP-5322
Safe
~
medium confidence
SCP-5322
Expected annual
$1.6M
One-time setup
$2.0M
Annual recurring
$1.6M
Personnel
14
Initial one-time setup is approximately $2.01M driven primarily by property acquisition, specialized instrumentation/vehicles, and contingency reserves; ongoing annual operations are roughly $1.595M/yr driven by staff wages, recurring legal/cover costs, equipment losses, and transport/communications.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with routine operations and no major incidents.
scheduled_tests
routine maintenance
no equipment losses
🚨
Minor Incident
$1.8M/yr
Localized incident (e.g., loss of a test vehicle/drone, small legal dispute) requiring equipment replacement and extra legal/response costs.
vehicle/drone disappearance
small public/legal incident
equipment failure
🚨
Major Breach
$2.8M/yr
Significant public exposure or containment escalation requiring large legal payouts, emergency staff surge, and use of contingency funds.
public breach/exposure
large litigation or media event
relocation or large-scale incident response
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Six guards to staff 24/7 rotations as specified in analyst notes. |
| Security Supervisor | 1 | On-site supervisor for shift coordination and initial incident command. |
| Research Scientist | 2 | Full-time researchers to design protocols and analyze sensor data. |
| Technical Lead | 1 | Lead researcher/technician to oversee instrumentation and data integrity. |
| Medical Officer | 1 | On-call medic/paramedic responsible for amnestic administration and emergency care. |
| Site Director / Executive Staff | 1 | Managerial oversight, liaison with Foundation HQ and legal. |
| Engineer / Maintenance | 1 | Responsible for generators, vehicles, drones, and site infrastructure maintenance. |
| Administrative Staff | 1 | Payroll, procurement, and records management support. |
Confidence Notes
Estimates use midpoints of analyst ranges and combine many operational assumptions (frequency of experiments, equipment loss rate, and legal exposure). Reasonable grounded data exists for staffing and basic capital but uncertainty remains around experiment-driven losses and the frequency/magnitude of legal or exposure events.