SCP-5325
Unknown
~
medium confidence
SCP-5325
Expected annual
$907K
One-time setup
$2.9M
Annual recurring
$895K
Personnel
8
Initial one-time setup and civil works (tunnel sealing, structural shoring, conservation) drive capital cost (~$2.9M), while staffing, local security, insurance and specialist monitoring dominate annual operating costs (~$899k/year).
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $895K/yr
Cost Scenarios
📊
Baseline
(baseline)
$895K/yr
Normal year with routine monitoring, conservation and no major incidents.
steady-state containment
scheduled conservation
routine monitoring
🚨
Minor Incident
$949K/yr
Localized vandalism, minor structural failure or small anomalous escalation requiring repairs and specialist response.
vandalism/graffiti
localized shoring failure
sensor anomaly requiring specialist visit
🚨
Political Exposure
$1.1M/yr
Municipal or heritage agency exposure forcing negotiations, compensation, and elevated PR/legal spending.
media leak
heritage claim
municipal inquiry
🚨
Major Extraction
$2.4M/yr
Emergency removal or full decommissioning (heavy-lift transport, cross-border approvals, extended conservator work).
structural collapse
active anomalous escalation
policy decision to remove artifact
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Site Lead / Executive Staff | 1 | [#8] Senior on-site manager responsible for operations and liaison. |
| Research Scientist | 2 | [#8, #14] Scientific staff conducting tests, analysis and conservation oversight. |
| Field Technician | 1 | [#8, #7] On-site technician responsible for sensor maintenance, sample handling and equipment. |
| Security Officer / MTF Agent | 2 | [#8, #9] On-site guards covering shifts and coordinating with contracted patrols. |
| Administrative Staff | 1 | [#8] Logistics, procurement, record-keeping and administrative duties. |
| Local Liaison / Legal Counsel (part-time) | 1 | [#18, #19] Part-time local liaison and cultural-heritage/legal adviser to manage municipal relations and translations. |
Confidence Notes
Estimates use mid-range values from analyst notes and the conservative summary; many line items (civil works, heavy-lift, legal settlements, anomalous escalation) have wide ranges and contingent high-end costs, so uncertainty is moderate.