SCP-5326
Unknown
~
medium confidence
SCP-5326
Expected annual
$916K
One-time setup
$732K
Annual recurring
$899K
Personnel
9
One-time capital and retrofit costs are approximately $732k driven by structural retrofits, explosion-proofing, fire suppression and a contingency reserve; recurring annual costs are approximately $899k driven by staff wages, ongoing research/monitoring and specimen maintenance.
One-Time Capital Costs
Total: $732K
Annual Recurring Costs
Total: $899K/yr
Cost Scenarios
📊
Baseline
(baseline)
$899K/yr
Normal operational year with routine maintenance, research, and no major incidents.
no major failures
scheduled maintenance
normal research activity
🚨
Minor Incident
$924K/yr
Localized spill, small equipment failure, minor fire or small contamination requiring cleanup and repair.
small petroleum leak
pump or valve failure
minor ignition or small localized fire
🚨
Major Breach
$1.6M/yr
Significant containment failure: large spill, major fire/explosion, widespread contamination, or specimen escape requiring emergency response, legal action and major remediation.
large spill (>100s L)
major fire/explosion
escape or wide contamination
memetic/cognitive exposure incident
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#13] Continuous on‑site security: 2guards per shift × 3 shifts. |
| Containment Technician | 2 | [#14] Full‑time technicians for daily checks, pumps, coating touchups and maintenance. |
| Veterinary / Research Biologist | 1 | [#15] Veterinarian/biologist for specimen care, surgeries, and monitoring. |
Confidence Notes
Many containment requirements and recurring drivers are explicitly described in the analyst notes and original article (equipment, staffing, petroleum feedstock), so estimates are grounded; ranges and some optional choices (imaging purchase vs outsourcing, depth of thaumaturgical research, contingency sizing) introduce moderate uncertainty.