SCP-5336
SAFE
~
medium confidence
SCP-5336
Expected annual
$116K
One-time setup
$48K
Annual recurring
$111K
Personnel
3
Estimated one-time setup costs are modest (~$48.5k) for containment, basic equipment and a limited reverse-engineering effort; recurring annual costs are ~ $110.8k/year, dominated by personnel (research + custodian) and occasional contracted studies.
One-Time Capital Costs
Total: $48K
Annual Recurring Costs
Total: $111K/yr
Cost Scenarios
📊
Baseline
(baseline)
$111K/yr
Normal year with routine containment and planned research activity; no major incidents.
routine testing
regular maintenance
no adverse prints
🚨
Minor Incident
$126K/yr
Small contamination or problematic print requiring emergency cleanup, overtime, and limited external testing.
contaminated sample
hazardous print content
local decontamination
🚨
Research Scaleup
$231K/yr
Research breakthrough or program expansion requiring hiring/contracting, extended lab reservations, and equipment upgrades.
evidence of plant/fungal cognition
external collaboration demand
need for long-term experiments
🚨
Major Incident
$361K/yr
Significant containment event (hazardous print, biohazard spread, legal exposure) requiring broad response.
hazardous or actionable printed instructions
biohazardous release
public/legal exposure
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Storage Custodian / Site Orderly | 1 | [#3] Single on-site custodian/orderly responsible for quarterly checks and handling (prorated ~0.05-0.1 FTE reflected in wages). |
| Research Scientist (PI) | 1 | [#9] Principal investigator responsible for experimental design and oversight (prorated part-time time included in research wages). |
| Lab Technician | 1 | [#9] Technician to run experiments, monitoring, and sample prep (prorated part-time time included in research wages). |
Confidence Notes
Cost ranges in analyst notes are fairly specific for equipment and recurring items, but uncertainty remains about scope/frequency of research, contractor use, and whether contingency is held one-time or refreshed; personnel FTEs and external-study frequency are principal uncertainties.