SCP-5349
Safe-Eparch
~
medium confidence
SCP-5349
Expected annual
$1.1M
One-time setup
$541K
Annual recurring
$1.1M
Personnel
16
One-time setup costs are roughly $541,000 driven by security, containment hardware, digitization and contingency planning; annual recurring costs are about $1,084,250/yr driven primarily by staff wages (security + research) and ongoing monitoring/contingency replenishment.
One-Time Capital Costs
Total: $541K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with standard staffing, monitoring, routine maintenance, and no major incidents.
no_incident
routine_maintenance
🚨
Minor Incident
$1.2M/yr
Accidental damage or localized degradation requiring emergency conservator deployment, emergency transfer and short-term elevated monitoring.
accidental_damage
localized_degradation
minor_theft_attempt
🚨
Major Breach
$1.8M/yr
Theft attempt, major biological degradation event, or exposure requiring large-scale recovery, legal suppression, and possible final-disposition actions.
theft_attempt
major_biological_failure
public_exposure
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] 24/7 dedicated guards for the Literature Wing (4–8 typical); cover pay included in staff_wages. |
| Research Scientist | 3 | [#9] Paleographers, entomologists and conservator-scientists (2–4 FTEs equivalent) conducting ongoing study. |
| Tactical Theology / Embedded Agents | 3 | [#11] Three Tactical Theology personnel embedded at Grey Abbey as described in containment procedures. |
| Conservator / Specialist | 1 | [#4] Lead conservator for treatment planning and periodic onsite stabilization work; additional consultants budgeted separately. |
| Engineer / Maintenance | 1 | [#3, #17] Responsible for HVAC tie-ins, UPS upkeep, sensor maintenance and calibration coordination. |
| Administrative Staff | 1 | [#24] Scheduling, access coordination, cover-story liaison and handling session supervision. |
| Site Director / Executive Staff | 1 | [#12, #23] Oversight, legal/cover coordination and internal valuation/accounting oversight. |
Confidence Notes
Analyst notes provide detailed itemized ranges which allow order-of-magnitude estimates, but many items have wide ranges (e.g., DNA work, deaccession costs, staffing levels) and some choices (outsourcing vs in-house aDNA facility, level of security) materially change totals; therefore confidence is medium.