SCP-5374
Keter
~
medium confidence
SCP-5374
Expected annual
$31.5M
One-time setup
$126.7M
Annual recurring
$30.7M
Personnel
95
Initial capital expenditures are substantial (primarily hangar construction, satellite/optical assets, R&D fit-out and large contingency/decommissioning reserves) totaling roughly $127M; ongoing annual operations are large as well, driven by staff wages, R&D/monitoring (satellites, IAU ops), cybersecurity, and cover/legal budgets (~$30.7M/yr).
One-Time Capital Costs
Total: $126.7M
Annual Recurring Costs
Total: $30.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$30.7M/yr
Normal operational year with no major incidents; routine monitoring, R&D and containment operations proceed as planned.
no_significant_incidents
routine_operations
🚨
Minor Incident
$31.9M/yr
Localized beam strike or small containment incident requiring emergency response, targeted remediation and additional amnestic work.
localized_beam_strike
single_farm_damage
small_contamination_event
🚨
Major Breach
$40.7M/yr
Significant containment breach or widespread offensive action by SCP-5374-1 causing large-scale damage, public exposure risk and major remediation/cover-up costs.
containment_breach
large_scale_cattle_disintegration
public_exposure
🚨
Decommissioning Operation
$70.7M/yr
Deliberate neutralization, specialized dismantling or off-world disposal of SCP-5374-1 requiring large one-time expenditures in that year.
neutralization_or_orbital_disposal
specialized_dismantling
Personnel
95 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 60 | [#4] 24/7 armed security force across three shifts (60 personnel). |
| Research Scientist | 12 | [#5] Xenobiologists, engineers, materials scientists and optics specialists. |
| Analyst / IAU Monitoring / OSINT | 10 | [#7] Continuous surveillance, OSINT filtering and imagery triage staff. |
| Engineer / Maintenance | 6 | [#14, #16] Engineers and maintainers for hangar, robotics and facility hardening. |
| Medical Officer | 2 | [#10, #29] Medical staff for amnestic procedures, medical monitoring and long-term care. |
| Administrative Staff | 3 | [#20, #9] Admin, legal liaison and cover/PR coordination support. |
| Archivist / Cultural Officer | 1 | [#28] Cataloguing and cultural-material management. |
| Technician / Lab Technician | 1 | [#5, #13] Technical staff for lab equipment and test-range operations. |
Confidence Notes
Analyst notes provide detailed cost ranges for most line items, enabling a reasoned estimate, but SCP unpredictability (disintegration beam, reappearance, decommissioning) and large ranges on key items (satellites, contingency, decommissioning) leave material uncertainty.