SCP-5376 Unknown ~ medium confidence
SCP-5376
Expected annual
$2.5M
One-time setup
$13.9M
Annual recurring
$2.2M
Personnel
9
One-time capital outlays are approximately $13.87M driven primarily by a large contingency/breach reserve and containment/facility upgrades; recurring annual operations are roughly $2.20M driven by staff wages, sacrificial vehicle replacement, logistics and ongoing contingency fund provisioning.
🏗️ One-Time Capital Costs Total: $13.9M
Containment Breach Reserve $10.0M
[#20] Conservative one-time contingency/reserve fund for catastrophic rebuild, relocation and major cover operations.
Facilities $2.3M
[#1, #2, #7, #17, #24, #26] Includes land/site hardening or purchase, initial arena construction, containment cell blast/bio upgrades, decontamination fitout, initial site infrastructure and targeted protective reinforcement of nearby Site-19.
Equipment $1.1M
[#3, #5, #9, #11, #12, #22] Includes installation of fire-jet systems, initial dirtbike fleet, armored/transport vehicles and tactical kit, ambulance purchase, initial fire-suppression vehicle/equipment, and IT/communications hardware.
Initial Research And Lab Setup $350K
[#13, #15] High-speed instrumentation, data-acquisition systems and laboratory/test rigs for analysis and monitoring.
Initial Amnestic Deployment $100K
[#19] One-time mass-amnestic / discovery-event deployment cost estimate.
Environmental Remediation Oneoff $50K
[#25] One-off remediation reserve for a localized contamination event (soil/groundwater remediation).
🔄 Annual Recurring Costs Total: $2.2M/yr
Staff Wages $742K/yr
[#8, #14] Salaries and overtime for 6 dedicated security guards (incl. overtime) and 2 researchers + 1 lab technician.
Containment Breach Fund Maintenance $500K/yr
[#20] Annual provisioning/maintenance of the longer-term contingency reserve fund for catastrophic events.
Administrative Overhead And Program Management $150K/yr
[#27] Program manager, procurement, accounting, security liaison and ~10–15% program overhead baked into recurring budgets.
Sacrificial Vehicles $139K/yr
[#4] Recurring purchase/replacement of disused vehicles used in sessions (high turnover).
Facilities Maintenance $130K/yr
[#1, #2, #12, #24, #26] Land/site maintenance, general utilities/upkeep, maintenance of fixed suppression systems and targeted monitoring of nearby structures.
Biohazard Cleanup $78K/yr
[#16] Recurring hazardous waste disposal and biohazard cleanup per destructive session.
Logistics And Transport $68K/yr
[#9, #10] Annual fuel/maintenance for security/transport vehicles and per-session convoy fuel/transport costs.
Supplies And Consumables $65K/yr
[#6, #17] Arena consumables and repair parts (lumber/steel/fasteners), decontamination supplies, PPE replacement and laundering.
Cover Story And Legal $65K/yr
[#18, #19] Permits/regulation compliance or covert compliance costs and ongoing amnestic/legal/coverup budget.
Research And Monitoring $60K/yr
[#13, #14, #15, #25] Research consumables, instrumentation calibration/data storage, and routine environmental monitoring.
Training And Psych Support $50K/yr
[#21] Annual training, drills and psychological counseling / PTSD prevention for staff.
Dirtbike Replacement $39K/yr
[#5] Ongoing replacement of destroyed/reinforced dirtbikes used by SCP-5376.
Arena Repairs And Replacements $35K/yr
[#2] Annual repairs and modular replacements for ramps, loops and stunt structures.
Fire Suppression Maintenance $27K/yr
[#12] Maintenance, training and replenishment for foam/extinguishers/portable suppression and dedicated equipment.
It And Communications Maintenance $25K/yr
[#22] Secure logging, data redundancy, storage costs and IT maintenance.
Medical Standby $23K/yr
[#11] Per-session contractor EMT/paramedic costs and upkeep/maintenance related to ambulance if used on-site.
Fire Jet Operation $20K/yr
[#3] Fuel, servicing and routine servicing for fixed and mobile flame jets.
Waste Salvage Offset $-15000/yr
[#23] Estimated annual salvage/recycling offsets from scrapping destroyed vehicles/metal (net negative line-item).
Cost Scenarios
📊 Baseline (baseline) $2.2M/yr
91.0% probability / year
Routine year with scheduled sessions, no major incidents; normal replacement/maintenance and reserve provisioning.
regular_sessions no_unplanned_explosions normal replacements
🚨 Minor Incident $2.4M/yr
8.0% probability / year +$200K vs baseline
Localized destructive event causing extra repairs, increased medical/cleanup, or small environmental remediation.
partial_arena_destruction larger-than-usual explosion extra_cleanup_and_repairs
🚨 Major Breach $27.2M/yr
1.0% probability / year +$25.0M vs baseline
Catastrophic detonation damaging the arena and nearby Site-19 infrastructure requiring major rebuild, public exposure response and large-scale cover operations.
full-scale detonation public casualties/exposure site infrastructure damage
👥 Personnel 9 total
Role Count Notes
Security Officer / MTF Agent 6 [#8] Dedicated armed escort detachment (6 guards) with rotations and overtime.
Research Scientist 2 [#14] Two dedicated researchers (physicist/engineer/biologist mix) supporting study and containment.
Lab Technician 1 [#14] One lab tech supporting experiments, instrumentation and sample handling.
📋 Confidence Notes
Line-item estimates are based on analyst ranges and clear containment requirements, so budget categories and recurring costs are reasonably well-scoped; however large ranges on capital and contingency items and the unpredictable failure modes of the anomaly limit precision, producing medium confidence.
← SCP-5375 ↑ All SCPs SCP-5377 →