SCP-5390
Safe
~
medium confidence
SCP-5390
Expected annual
$770K
One-time setup
$1.6M
Annual recurring
$721K
Personnel
7
Initial setup and contingency reserves drive year-one costs (~$1.56M), dominated by a contingency for containment expansion, cryogenic storage purchase/installation, and cover-story setup/vendor buyouts; ongoing annual costs (~$721k) are driven primarily by covert enforcement staff wages, research/forensic work, and legal/cover-story maintenance.
One-Time Capital Costs
Total: $1.6M
Annual Recurring Costs
Total: $721K/yr
Cost Scenarios
📊
Baseline
(baseline)
$721K/yr
Routine year with standard monitoring, maintenance, research, and occasional recoveries; no major incidents or escalation.
normal manifestation rate
no public exposure
no major legal incidents
🚨
Minor Incident
$781K/yr
A year with a cluster of manifestations or a small public incident requiring extra transports, exhumations, legal payouts, and increased amnestic operations.
multiple recoveries (above-average year)
one or two exhumations
local press interest requiring extra PR/legal payouts
🚨
Major Breach
$2.7M/yr
Significant public exposure or simultaneous multiple manifestations requiring rapid large-scale amnestic operations, mass containment measures, and activation of the containment expansion contingency.
public exposure / media leak
simultaneous clustered manifestations
requirement to lease/activate temporary containment expansion
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | Core covert enforcement operatives patrolling evenings, amnestic administration and recoveries. (Mapped to #3) |
| Pathologist | 1 | Site-30 pathologist for intake, autopsy, and specimen analysis. (Mapped to #10) |
| Forensic Technician | 1 | Support for specimen processing, DNA/fingerprint prep, and cataloguing. (Mapped to #10) |
| Surveillance Technician | 1 | Monitors covert camera feeds and maintains sensor network. (Mapped to #5) |
Confidence Notes
Estimates are built from analyst ranges in the notes; core recurring items (staff wages, cryo maintenance, PR/legal) are reasonably constrained, but wide variance in vendor buyouts, contingency expansion, and incident frequency introduces uncertainty.