SCP-5420 Safe ~ medium confidence
SCP-5420
Expected annual
$41.1M
One-time setup
$3.7B
Annual recurring
$30.4M
Personnel
30
Estimated one-time capital expenditure of $3,663,300,000 driven primarily by spacecraft development, launch, and potential follow-up/sample-return missions; recurring operations and secrecy overhead are estimated at $30,425,000 per year. [#30]
🏗️ One-Time Capital Costs Total: $3.7B
Sample Return Mission $1.2B
[#15] Sample-return mission (mission hardware + mission operations) — separate from laboratory buildout in initial_research_and_lab_setup.
Followup Lander $900.0M
[#14] Follow-up robotic/lander/penetrator mission to SCP-5420-B (mid-range for a capable, safe mission).
Equipment $504.0M
[#1, #8, #11, #12] Spacecraft bus & instrument suite Probe 7-B (~$500M), secure archive hardware & installation (~$1M), initial radio-analysis cluster & software (~$2.5M), imaging pipeline development (~$0.5M).
Launch Vehicle $275.0M
[#3] Medium/heavy-class launch including integration and insurance (mid-range estimate).
Contingency Reserve $200.0M
[#26, #30] Program-level contingency (20–40% of capital); included to cover cost growth and mission unknowns; ties to overall program summary.
Facilities $140.0M
[#6, #16] Ground-station build (~$90M) plus Site-196 mission-control / high-security expansion (~$50M) — structural construction, reinforcement, EMI/EMP/HVAC work.
Power System $125.0M
[#2] Deep-space-capable power (RTG + integration assumed for reliability) chosen here; solar option would reduce cost materially.
Redundancy Reserve $100.0M
[#13] Contingency fund for backup probe or rapid replacement (reserve held instead of building full second probe).
Emergency Response Fund $100.0M
[#27] Ready-access fund for rapid follow-ups, priority launch options, or emergency tasking.
Initial Research And Lab Setup $50.6M
[#10, #15] Initial hiring/setup for LANCER science team (~$0.6M) plus containment / analysis lab buildout and instrumentation (~$50M) for sample handling and anomalous-material work.
Propulsion Fuel $40.0M
[#4] Fuel and propellant margin for transfer and multi-year stationkeeping (mid-range for chemical/electric options).
Insurance Reserve $10.0M
[#29] Insurance / reputational contingency funds and covert payments reserved for high-risk exposure events.
Decommissioning $5.0M
[#28] End-of-mission disposal, archive transfer and facility mothballing (mid-range).
Cover Story Initial $5.0M
[#20] Initial cover-story and coordinated public-relations funding to establish plausible mission narratives with partners.
Legal Setup $5.0M
[#21] Initial legal, interagency agreements, classified contracting setup and liaison arrangements.
Testing And Qualification $2.0M
[#24] Thermal-vacuum, vibration, antenna ranges, signal-injection and end-to-end rehearsals (mostly up-front).
Cybersecurity Hardening $1.0M
[#18] Initial classified-network hardening, air-gap implementation and hardening of telemetry archives.
Personnel Vetting Initial $500K
[#23] Initial background checks, polygraphs and clearance processing for new personnel.
Web Crawler Dev $200K
[#19] Initial development of web-crawlers and leak-monitoring tooling.
🔄 Annual Recurring Costs Total: $30.4M/yr
Staff Wages $13.0M/yr
[#7, #10] Mission operations (flight controllers, navigators, uplink team) and core science & analysis team salaries and overhead (combined mid-range).
Counterintelligence Ops $5.0M/yr
[#22] Field operations, human-source handling, and active counterintelligence to intercept leaks and manage narratives.
Research And Monitoring $3.7M/yr
[#5, #9, #11, #12] DSN/ground comms leasing (~$3M/yr), long-term data storage & maintenance (~$0.25M/yr), cloud/compute costs for radio analysis (~$0.3M/yr) and imaging pipeline operations (~$0.175M/yr).
Cover Story And Legal $3.0M/yr
[#20, #21, #29] Ongoing public-relations campaigns, occasional staged releases, legal renewals, interagency liaison and limited covert payments/insurance replenishment.
On Site Security $2.0M/yr
[#17] Armed security, classified-ops guards and perimeter protection staffing and related operational costs.
Facilities Maintenance $1.5M/yr
[#6, #16] Yearly maintenance, utilities, HVAC and specialized shielding upkeep for Site-196 mission control, archives and ground antenna.
Web Crawlers And Moderation $1.0M/yr
[#19] Ongoing web monitoring, takedowns, moderation and legal takedown actions.
Personnel Vetting $500K/yr
[#23] Ongoing re-clearance, psychological screening and continuous monitoring of personnel.
Cybersecurity Ops $400K/yr
[#18] Ongoing intrusion detection, monitoring, classified network administration and incident response for telemetry/data systems.
Supplies And Consumables $300K/yr
[#25] Consumables, spare parts, media/tape refresh and calibration supplies; obsolescence refresh cycles.
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $30.4M/yr
91.0% probability / year
Normal operational year with continuous monitoring, routine maintenance and staff operations only.
routine monitoring no hardware failures no public exposure
🚨 Minor Incident $40.4M/yr
7.0% probability / year +$10.0M vs baseline
Localized anomaly: probe subsystem failure, brief signal anomaly, or modest security leak requiring accelerated investigation and repairs.
probe subsystem failure temporary comms outage minor data leak
🚨 Major Breach $530.4M/yr
2.0% probability / year +$500.0M vs baseline
Catastrophic hardware loss or major loss of data/cover leading to emergency replacement launch and major legal/CI response.
probe failure beyond repair major public exposure loss/theft of samples or classified data
👥 Personnel 30 total
Role Count Notes
Mission Operations (Flight / Mission Control) 15 [#7] Flight controllers, navigators, uplink team and ops center staff; 24/7 staffing covered in mission ops portion of staff_wages.
Research Scientist / Analysis Team 12 [#10] Astronomers, radio engineers, signal analysts, xenoarchaeologists, linguists and systems engineers covered in science salaries portion of staff_wages.
Administrative Staff 3 [#10] Administrative and program management support included in staff_wages estimates.
📋 Confidence Notes
Analyst notes provide detailed range estimates for most line items, allowing mid-range budgeting; uncertainty remains high for follow-up/sample-return mission scope, contingency sizing and political/insurance exposure, so confidence is medium.
← SCP-5419 ↑ All SCPs SCP-5421 →