SCP-5421
Unknown
~
medium confidence
SCP-5421
Expected annual
$6.7M
One-time setup
$6.0M
Annual recurring
$6.5M
Personnel
50
Initial one-time setup (~$6.0M) is driven by property acquisition, facility upgrades, research/medical clinic buildout and a large civilian-relocation reserve; recurring yearly operations (~$6.48M/year) are dominated by specialized staff wages, regional MTF readiness, research and incident-response reserves.
One-Time Capital Costs
Total: $6.0M
Annual Recurring Costs
Total: $6.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.5M/yr
Normal year with no major incidents: ongoing operations, monitoring, regular research and preparedness expenses only.
no breaches
standard monitoring
routine research activities
🚨
Minor Incident
$7.0M/yr
Limited disclosure or a small-scale containment event requiring extra amnestics, takedowns, legal payments and PR activity.
small public leak
several civilians viewed restricted material
targeted takedowns and additional amnesticizations
🚨
Major Breach
$10.5M/yr
Large-scale breach requiring evacuation/condemnation of building, mass amnestic deployment, large legal settlements and emergency acquisitions.
widespread public dissemination
building-wide contamination/evacuation
lengthy legal & acquisition actions
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 6 | [#6] Continuous 24/7 onsite guard presence (2 per shift, 3 shifts). |
| Mobile Task Force / Regional Response | 12 | [#7] Regional rapid-response MTF detachment on-call for breaches and takedowns. |
| Research Scientist | 6 | [#14] Memetics/safe-study researchers operating remote/robotic study tooling. |
| Medical Officer | 4 | [#8] Medical & amnesticization staff for Class A amnestic administration and monitoring. |
| RAISA / Records & Info Security Staff | 5 | [#11, #12] Team performing active monitoring, legal takedowns, and secure records destruction coordination. |
| Cybersecurity Specialist | 3 | [#29] Rapid takedown, scraping and mirror-cleaning specialists. |
| Translator / Cultural Liaison | 2 | [#25] Japanese-language specialists and cultural liaison staff. |
| Administrative Staff | 2 | [#19, #28] Local liaison, administrative coordination and O5-level logistics support. |
| Technician / Support Staff | 10 | [#4, #13, #14] Facilities, surveillance, robotics and IT technicians supporting equipment and research operations. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs, but memetic potency, required frequency of amnestic treatments, and whether Foundation must acquire full building control remain uncertain; mid-range estimates used for scenario costs lead to moderate confidence.