SCP-5468
Uncontained
~
medium confidence
SCP-5468
Expected annual
$1.3M
One-time setup
$32.5M
Annual recurring
$1.1M
Personnel
10
One-time deployment and containment estimated at $32,480,000 driven primarily by mission architecture, insurance/asset replacement reserves, and surface/retrieval hardware; recurring annual costs are approximately $1,110,000/yr driven by staff wages, research, and facilities/monitoring.
One-Time Capital Costs
Total: $32.5M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents: routine monitoring, research, maintenance, and staff wages only.
no_incident
routine_monitoring
🚨
Minor Incident
$1.3M/yr
Localized anomalous discharge or containment event causing limited damage and requiring repairs, investigations, and temporary increased security.
minor_discharge
sensor_alarm
localized_damage
🚨
Major Breach
$6.1M/yr
Significant uncontrolled release/damage requiring a follow-up retrieval mission, major asset replacement, extended investigations and PR response.
large_discharge
equipment_destruction
loss_of_storage_unit
🚨
Political Exposure
$1.4M/yr
Public leak or observed event forcing large-scale PR, legal payouts, diplomatic engagement, and expanded redaction operations.
public_leak
satellite_imagery_exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | Terrestrial site security staffing (24/7 coverage) and mission security; salaries included in staff_wages. |
| Research Scientist | 3 | Containment R&D team performing experiments, simulations and monitoring; salaries included in research_and_monitoring. |
| Engineer / Maintenance | 1 | Site engineer for sensor maintenance, storage unit upkeep; salary included in staff_wages. |
| Medical Officer | 1 | Medical readiness and pathology coordination; partial-year/full-time equivalent covered under emergency_medical recurring/initial budgets. |
| Administrative Staff | 1 | Administrative and liaison work for cover-story, logistics and documentation; included in staff_wages and cover_story budgets. |
Confidence Notes
Analyst notes provide detailed line items and realistic ranges, but large uncertainties remain around mission-scale choices (marginal activation vs new crewed missions), insurance/reserve sizing, and lunar-specific recurring costs. Estimates therefore have moderate confidence.