SCP-5469
Unknown
~
medium confidence
SCP-5469
Expected annual
$2.2M
One-time setup
$2.6M
Annual recurring
$2.1M
Personnel
14
One-time setup is approximately $2.23M driven primarily by a $1.0M contingency reserve, land acquisition, and initial infrastructure; recurring operations are ~ $2.12M/yr driven by security & research salaries, a daily firefighting standby contract, and ongoing research/monitoring costs.
One-Time Capital Costs
Total: $2.6M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal uneventful year with no major incidents; routine operations, monitoring, and scheduled experiments.
no breach
regular maintenance and scheduled experiments
daily standby operations
🚨
Minor Incident
$2.4M/yr
Localized containment incident (e.g., uncontrolled small fire spread or equipment failure) requiring emergency response, overtime, temporary repairs, and legal/PR activity.
small fire breaches containment
external firefighting and overtime
minor repair and legal/PR activation
🚨
Major Breach
$4.6M/yr
Significant escalation (structure fully involved, wider spread, discovery risk) requiring demolition/abatement, large-scale mitigation, major legal settlements and extended research response.
full structural failure with wider fire spread
public exposure or litigation
need for demolition, large-scale abatement and extended MTF/research mobilization
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] Six FTE site guards to provide 24/7 coverage, per analyst notes. |
| Site Supervisor / Security Supervisor | 1 | [#5] On-call supervision and shift oversight included in security staffing estimate. |
| Research Scientist | 4 | [#13] Four researchers to study causal loop and entities (included in research staffing). |
| Lab Technician | 2 | [#13] Two technical staff supporting experiments and monitoring (included in research staffing). |
| Administrative Staff | 1 | [#13] One administrative staff member for project admin and records (included in research staffing). |
Confidence Notes
Estimates are directly based on analyst line-item figures and are internally consistent; uncertainty remains due to anomalous behavior, local contracting variability, and the discretionary size of contingency/settlement funds which dominate one-time costs.