SCP-5514
Unknown
~
medium confidence
SCP-5514
Expected annual
$551.0M
One-time setup
$713.0M
Annual recurring
$466.0M
Personnel
120
One-time capital and reserve costs are approximately $713,000,000 driven by facility construction, contingency replacement and reserve/decommissioning funds; recurring operations run about $466,000,000/year driven primarily by battle-damage repair reserves, civilian reconstruction liability and ongoing weapons/consumables/logistics.
One-Time Capital Costs
Total: $713.0M
Annual Recurring Costs
Total: $466.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$466.0M/yr
Normal operational year with no major unexpected incidents; routine deployments and scheduled maintenance only.
routine_deployments
scheduled_maintenance
no_major_incidents
🚨
Minor Incident
$491.0M/yr
One or more small-to-moderate engagements requiring elevated munitions use and incremental repairs.
multiple_small_engagements
increased_munitions_and_repairs
🚨
Major Incident
$666.0M/yr
Significant engagement causing heavy structural damage requiring major repairs and increased logistics/support.
large_scale_battle_damage
extended_repair_campaign
🚨
Catastrophic Loss
$1.3B/yr
Destruction or irreparable loss of SCP-5514 requiring full replacement or major multi-year rebuild and massive liability payouts.
total_system_loss
major_urban_casualties_and_reconstruction
Personnel
120 total
| Role | Count | Notes |
|---|---|---|
| Pilots (MTF Eta-5 / liaisons) | 12 | [#11, #16] Pilots and liaison pilots for SCP-5514 operations and GOC/Hy-Brasil embedded personnel. |
| Security Officer / MTF Agent | 24 | [#11, #28] Armed security and MTF personnel for perimeter security, deployment protection and on-site security operations. |
| Research Scientist | 12 | [#10, #26] Scientists and anomalous-physics researchers assigned to study SCP-5514 subsystems and sensor analysis. |
| Engineer / Maintenance | 30 | [#2, #4, #6, #15] Engineers and maintenance staff for power plant, containment hardware, tooling and battle-damage repairs. |
| Technician | 20 | [#5, #7, #30] Specialist techs for monitoring, consumables replacement, containment field calibration and spare parts handling. |
| Medical Officer | 4 | [#24] Medical staff for field hospital, emergency care and long-term rehabilitation. |
| Administrative Staff | 4 | [#11, #17] Admin and program management supporting operations, budgets and cover-up coordination. |
| Logistics | 12 | [#19, #29] Logistics and transport coordinators for heavy-lift movement, infrastructure repairs and convoy planning. |
| Site Director / Executive Staff | 2 | [#11] Senior leadership and executive oversight for operations and joint Coalition coordination. |
Confidence Notes
Analyst notes provide detailed line-item estimates which improves confidence, but anomalous behaviors, engagement tempo and political/cover-up variables introduce significant uncertainty.