SCP-5542
Euclid
~
medium confidence
SCP-5542
Expected annual
$1.5M
One-time setup
$1.8M
Annual recurring
$1.4M
Personnel
10
Initial one-time setup estimated at approximately $1.84M driven by acquisition, emergency reserves, and equipment/lab setup; ongoing annual operating costs are approximately $1.43M/yr, dominated by staff wages (security + research), research/monitoring, and logistics/contingency reserves.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year: regular monitoring, staff operations, routine maintenance, and reserve replenishment without major incidents.
no_major_storm
no_large_removal
routine_operations_only
🚨
Minor Incident
$1.5M/yr
Localized incident such as pest outbreak, minor public discovery, or small washout requiring emergency response and PR/legal overtime.
local_infestation
small_public_incursion
minor_coastal_erosion_event
🚨
Major Storm Response
$2.0M/yr
Significant storm or tide event causes partial cake washout requiring heavy equipment mobilization, shoreline engineering, and large disposal efforts.
severe_storm
major_coastal_erosion
marine_spill_of_anomalous_material
🚨
Containment Scaling
$2.9M/yr
Policy decision or forced operation to remove/neutralize a large volume of cake, triggering excavation, transport, disposal, permitting, and major contractor fees.
policy_removal_decision
large-scale_excavation
regulatory_mandate
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#6] Six guards to provide 24/7 three-shift perimeter coverage; salary assumptions per-note (~$40k + 25% benefits each). |
| Research Scientist | 3 | [#18] Three research staff to run experiments and characterization (mid-range staffing and salary assumptions; benefits included in staff_wages). |
| Containment Officer / Operations | 1 | [#18] Single containment/operations officer for site coordination and oversight (salary + benefits included). |
Confidence Notes
Analyst notes provide detailed line-item ranges enabling mid-confidence estimates, but many items have wide ranges and contingent high-cost, low-frequency events (removal, major storm, regulatory fines) making precise budgeting uncertain.