SCP-5550
Keter
~
medium confidence
SCP-5550
Expected annual
$3.3M
One-time setup
$16.8M
Annual recurring
$3.1M
Personnel
10
Estimated one-time establishment and mitigation costs are approximately $16.8M, driven by vault/secure-site works, R&D (memetic and robotics), and a large rapid-response contingency reserve; recurring annual costs are approximately $3.07M driven primarily by security staffing, specialist salaries, ongoing R&D/monitoring, and contingency/cover-up budgets.
One-Time Capital Costs
Total: $16.8M
Annual Recurring Costs
Total: $3.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.1M/yr
Normal year with no major incidents; containment posture maintained and routine R&D/monitoring continues.
no major placement attempts
routine monitoring
normal staffing and R&D
🚨
Minor Incident
$3.3M/yr
Localized placement or attempted placement on a small structure requiring rapid remote retrieval, medical response and amnestic operations.
small structure placement
limited public exposure
local retrieval operation
🚨
Major Breach
$8.1M/yr
Sustained attempt to seize or recapture Site-28 or larger placement requiring multi-day operations, heavy remote retrieval and sizable contingency reimbursements.
coordinated hostile operation
failed initial containment
extended recovery operation
🚨
Catastrophic Breach
$23.1M/yr
SCP-5550 is placed atop a high-value populated structure (e.g., skyscraper, airport) causing mass evacuation, major economic disruption and large settlement/reimbursement costs.
placement on major urban/high-traffic structure
mass evacuation required
widespread media exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#2] Six guards to cover three 8-hour shifts (salaries + benefits and training/gear included in staff_wages). |
| Specialist Personnel (Parapsychologist / Memeticist / Cultural Historian) | 4 | [#21] Four specialist staff (higher-than-average salaries for memetic/parapsych/cultural expertise included in staff_wages). |
Confidence Notes
Analyst notes provide ranges for most line items and describe plausible operational postures; however, activation scenarios, political costs, and contingency requirements are highly variable, so estimates use mid-range choices and carry moderate uncertainty.