SCP-5577 Unknown ~ medium confidence
SCP-5577
Expected annual
$3.6M
One-time setup
$8.4M
Annual recurring
$3.5M
Personnel
25
Initial capital fit-out and cavern stabilization drive one-time costs (~$8.41M), while recurring annual expenses (~$3.54M/yr) are dominated by security and research staffing, specialized lab operations, and clandestine overhead.
🏗️ One-Time Capital Costs Total: $8.4M
Facilities $5.3M
[#1, #2] Site construction (Provisional Site-1538) and initial cavern stabilization/geotechnical work (rock bolting, shotcrete, waterproofing, seismic sensors).
Contingency Fund $1.0M
[#21] Containment breach contingency fund / emergency reconstruction reserve (holding fund for rapid response, repairs, replacement equipment).
Equipment $810K
[#5, #8, #11, #10, #12, #18, #20, #23] Audio/AV install, secure vault shelving & systems, remote handling systems, initial hearth refractory install, initial PPE kits, heavy-duty workshop equipment, initial IT/database hardware, radiological instrumentation (initial purchase).
Initial Research And Lab Setup $700K
[#6] Anomalous-item processing lab fit-out (vaults, gloveboxes, Faraday cages, negative-pressure rooms).
Extraordinary Containment $500K
[#24] One-off bespoke containment / project costs for exceptional object (SCP-5577-P style).
Cover Story Initial $100K
[#15] Initial cover package (archaeological façade, local facilitation payments, permits/fake publications).
🔄 Annual Recurring Costs Total: $3.5M/yr
Staff Wages $1.7M/yr
[#3, #4, #13] Security staff salaries (armed 24/7), on-site research team salaries (site lead, researchers, lab techs, linguist, conservator), and medical staff/medevac contracts.
Research And Monitoring $880K/yr
[#5, #6, #7, #19, #20, #23, #26] Continuous audio/video retention & analysis, lab consumables & maintenance, analytical testing budget (ICP-MS, SEM/TEM, outsourced tests), long-term research program, IT ops & secure backups, radiological/contamination testing & calibration, contingency replication research.
Operational Overhead $461K/yr
[#25] Clandestine administrative overhead, procurement obfuscation, surrogate companies and classified miscellaneous costs (estimated 15% of operational budget).
Cover Story And Legal $150K/yr
[#15, #22] Ongoing cover payments, archaeological liaison, permits, local hires and legal/diplomatic overhead.
Power And Utilities $120K/yr
[#9] Continuous power, HVAC, forge/hearth energy, water-cooling and general site utilities.
Equipment Maintenance $100K/yr
[#11, #18] Maintenance & spare parts for remote manipulators, robotic systems, and replacement/maintenance of workshop tools and heavy equipment.
Supplies And Consumables $70K/yr
[#12, #10, #14, #17] PPE consumables & decon supplies, hearth fuel / refractory replacement, amnestic inventory & administration, waste handling and hazardous-waste contractor fees.
Facilities Maintenance $30K/yr
[#2] Ongoing cavern stabilization, geotechnical inspections, and structural maintenance.
Logistics And Transport $30K/yr
[#16] Secure transport & covert logistics (armored transfers, escorts, shipping for offsite testing).
Inventory Operations $25K/yr
[#8] Secure storage inventory operations, slotting, tamper monitoring and cataloging maintenance for SCP-5577-2 stock.
Cost Scenarios
📊 Baseline (baseline) $3.5M/yr
84.5% probability / year
Normal year with continuous operations, no major incidents; covers routine staffing, research, maintenance, utilities, and overhead.
steady production and monitoring routine maintenance no breaches or exceptional events
🚨 Minor Incident $3.7M/yr
12.0% probability / year +$200K vs baseline
Localized incident such as staff injury, small equipment failure, or limited contamination requiring repairs, medevac, and increased consumables.
tool/equipment failure single staff injury requiring medevac localized contamination event
🚨 Major Breach $5.0M/yr
3.0% probability / year +$1.5M vs baseline
Significant containment breach or structural incident requiring MTF deployment, emergency reconstruction, large equipment replacement, and public mitigation.
partial cavern collapse multiple-object exposure large-scale equipment loss
🚨 Scp 5577 P Event $6.0M/yr
0.5% probability / year +$2.5M vs baseline
Exceptional event involving creation or discovery of SCP-5577-P (or similar), requiring bespoke containment projects, long-term care or surgical intervention and specialized infrastructure.
production of SCP-5577-P discovery of an exceptional un-recyclable object requirement for bespoke containment project
👥 Personnel 25 total
Role Count Notes
Security Officer / MTF Agent 16 [#3] 24/7 armed security staff across multiple shifts; estimate matches security salary budget.
Site Director / Lead Researcher 1 [#4] Senior site lead included in research salary pool.
Research Scientist 3 [#4] Full-time researchers (archaeology/metallurgy); part of research team salary allocation.
Laboratory Technician 2 [#4] On-site lab techs for sample handling and experiments; included in research salaries.
Linguist / Phonetics Specialist 1 [#4] Specialist for monitoring vocalizations and analysis.
Conservator 1 [#4] Artifact preservation and handling specialist.
Medical Officer 1 [#13] On-site medical staff / paramedic and medevac arrangements.
📋 Confidence Notes
Article and analyst notes enumerate most required items and provide ranges; however anomalous behavior (SCP-5577-P) and site-specific variables introduce material uncertainty in upper-tail costs.
← SCP-5576 ↑ All SCPs SCP-5578 →