SCP-5653
Unknown
~
medium confidence
SCP-5653
Expected annual
$7.1M
One-time setup
$55.3M
Annual recurring
$6.8M
Personnel
37
Initial one-time capital (secure works, reserves, equipment) is dominated by large remediation and indemnity reserves totaling tens of millions; steady-state annual operations are driven by personnel (permanent guards + MTF) and recurring monitoring, legal/liaison, and insurance costs (~$6.8M/yr).
One-Time Capital Costs
Total: $55.3M
Annual Recurring Costs
Total: $6.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.8M/yr
Normal, uneventful year with steady operations, monitoring, and routine maintenance only.
no breach
routine maintenance
scheduled exercises
🚨
Minor Incident
$7.3M/yr
Localized breach or discovery requiring a rapid MTF deployment, limited repairs, targeted conservation and increased legal/PR activity.
localized breach
limited structural/archaeological damage
small-scale casualty or sample acquisition
🚨
Major Breach
$16.8M/yr
Significant containment failure or mass incursion requiring large-scale remediation, use of breach reserves, major conservation/restoration and international/legal response.
mass casualty or multiple-sepulcher breach
extensive structural damage
activation of breach remediation reserve
🚨
Political Exposure
$9.8M/yr
High-profile leak or political scandal requiring major legal settlements, extended PR, and diplomatic mitigation with the Holy See.
major media leak
Vatican diplomatic escalation
public disclosure risk
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Guard | 12 | [#1] Permanent Vatican Relic Recovery Office guards for 24/7 coverage (modeled as 12 personnel to match recurring guard salary budget). |
| MTF Operator / Specialist | 16 | [#3] MTF Zeta-9 on-call operators, EOD/engineer support and medics (salaries modeled for 16 operators as baseline). |
| Operations / Control-room Operator | 8 | [#10] 24/7 monitoring staff (modeled as 8 FTE to represent 3–4 operators per shift with rotations). |
| Conservator / Archaeologist | 1 | [#11] Specialist conservator/archaeologist oversight (contracted/embedded cultural-heritage lead). |
Confidence Notes
Analyst notes provide detailed line-item ranges, but many large optional choices (BSL-3 build vs contract labs, level of reserves retained, extent of structural work) introduce uncertainty. Midpoint assumptions were used where ranges were wide.