SCP-5671
Unknown
~
medium confidence
SCP-5671
Expected annual
$4.2M
One-time setup
$5.0M
Annual recurring
$3.6M
Personnel
28
Estimated one-time setup costs are approximately $4.995M for a contained facility upgrade and specialized hardware; recurring annual costs are approximately $3.586M driven primarily by staff wages (security, medical, and research), ongoing maintenance, consumables, and contingency reserves.
One-Time Capital Costs
Total: $5.0M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal operational year with no major containment incidents; routine monitoring, staffing, and scheduled maintenance only.
no containment breaches
regular staffing levels
scheduled maintenance only
🚨
Minor Incident
$3.8M/yr
Localized breach or contamination event requiring targeted medical treatment, repairs, extra decontamination and limited staff overtime.
single-cell breach
limited staff exposure
localized decontamination
🚨
Major Breach
$7.1M/yr
Widescale containment breach affecting multiple staff and cells requiring mass decontamination, replacement equipment, medical surge, and legal/cover operations.
multi-cell breach
MTF engagement and casualties
large-scale decontamination
🚨
Catastrophic Breach
$28.6M/yr
Site-level failure or public exposure requiring mass evacuation, prolonged operations, replacement of infrastructure, large-scale remediation and potential public mitigation/cover-up operations.
site-wide containment failure
public exposure/political oversight
mass casualties and long-duration remediation
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#13] Armed site guards and rapid response containment personnel (6–12 guards + 4–8 rapid responders aggregated). |
| Research Scientist | 6 | [#14] Dedicated R&D team for microbiology, histology and sequencing (4–10 researchers). |
| Medical Officer / Clinical Staff | 4 | [#12] Infectious disease clinicians, nurses and biomedical technicians (3–6 FTE clinicians/technicians). |
| Engineer / Maintenance | 2 | [#25] Facility engineers and specialists for HVAC, suitports, and Ippo glass maintenance (1–3 FTE). |
Confidence Notes
Estimates are based on explicit analyst ranges provided for individual line items and the SCP article's breach history; however wide ranges for many items (e.g., cell upgrades, incident reserve, personnel needs) and uncertainty about breach frequency reduce confidence.