SCP-5672
Unknown
~
medium confidence
SCP-5672
Expected annual
$2.8M
One-time setup
$4.4M
Annual recurring
$2.6M
Personnel
14
Estimated one-time capital expenditures of ~$4.4M for portals, labs, vaults and specialized equipment; baseline recurring operations (routine portal maintenance, staffing, travel, medical support, lab consumables and overhead) roughly $2.63M/year. Main cost drivers are recurring personnel/readiness and optional large-scale research program decisions.
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal year: routine portal maintenance, single annual activation with planned staffing, sample analysis, logistics and program overhead; full-scale excavation program not pursued.
annual_activation
routine_maintenance
scheduled_research
🚨
Minor Incident
$3.2M/yr
Localized ritual escalation or multiple incapacitations requiring limited rapid-response MTF deployment, additional medevac, expanded forensic processing and short-term asset replacements.
ritual_escalation
unexpected_incapacitation
increased_forensic_load
🚨
Major Breach
$3.9M/yr
Significant containment failure or exposure leading to international/legal emergency response, major asset recovery, and heavy diplomatic/legal costs.
civilian_exposure
international_incident
large_scale_deployment
🚨
Research Breakthrough Scale Up
$3.6M/yr
Foundation elects to commence full-scale, multi-year excavation and custody program, committing the program-level ~$1M/yr budget in addition to baseline operations.
strategic_decision
significant_research_value
artifact_recovery
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | Archaeologists/anthropologists/thaumaturgic researchers; primary recipients of the archaeology team budget [#10]. |
| Engineer / Maintenance | 3 | Portal and sensor technicians responsible for year-round portal/hardware maintenance and sensor calibration [#1, #12, #13]. |
| Security Officer / MTF Agent | 4 | Site-120 security and on-call MTF personnel for activation windows; additional surge personnel hired or reassigned during activations (overtime in staff_wages) [#3, #15]. |
| Medical Officer | 1 | On-call medical lead for planning and liaison; day-of medevac and field hospital staffed via contracts/overtime [#5, #6]. |
| Administrative Staff | 1 | Program admin, logistics and cover/contract management (apportioned overhead and cover story operations) [#16, #24]. |
| Conservation Specialist / Curator | 1 | Artifact conservation and vault management; included in storage/conservation recurring costs [#18]. |
Confidence Notes
Analyst notes provide detailed line-item estimates and reasonable midpoints; however ranges and single-day-per-year nature of the site introduce uncertainty (activation variability, incident probabilities, and Foundation policy choices about pursuing full excavation). Thus medium confidence in aggregate figures.