SCP-5674
Unknown
?
low confidence
Sacred Relic #5674
Expected annual
$9.4M
One-time setup
$79.5M
Annual recurring
$9.0M
Personnel
28
One-time setup and contingency reserves dominate costs (≈$79.5M), driven by redundant underground facilities and a large contingency fund; annual operations are substantial (~$9.05M/yr) driven by staffing, research, information-security and insurance.
One-Time Capital Costs
Total: $79.5M
Annual Recurring Costs
Total: $9.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.0M/yr
Normal year with no major incidents; steady-state operations and routine research.
no breach
routine operations
scheduled maintenance
🚨
Minor Incident
$9.3M/yr
Localized incident requiring ERT response, limited repairs, extra PR/legal action and short-term overtime.
small breach or sensor alarm
limited staff exposure
local media attention
🚨
Major Breach
$16.0M/yr
Significant containment failure requiring relocation to backup site, major repairs, large-scale response and extended PR/legal operations.
partial containment failure
widespread memetic exposure
activation of secondary site
🚨
Catastrophic Breach
$49.0M/yr
Severe reality-affecting or memetic event requiring full-scale emergency response, public-safety measures and use of contingency reserves/decommissioning.
major reality/memetic activation
regional/national exposure
mandatory entombment or large-scale evacuation
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#6] 12 guards + 2 supervisors for 24/7 posts as specified in analyst notes. |
| Emergency Response Team (ERT) member | 6 | [#7] Specialized rapid-reaction hazmat/containment team members covered by ERT salary line. |
| Research Scientist | 2 | [#8] Memetics/psych research scientists. |
| Research Lead / Anomalist | 1 | [#8] Lead anomalist role included in research staffing costs. |
| Conservator (Artifact Specialist) | 1 | [#8] Artifact conservator included in research staff. |
| Research Technician | 3 | [#8] Lab techs and support staff included in research staffing. |
| Lab Manager | 1 | [#8] Lab manager / operations lead included in research staffing. |
Confidence Notes
Large ranges in analyst estimates and unknown object-class produce high uncertainty; many line items are optional or highly scenario-dependent, so cost midpoints and scenario probabilities are approximate.