SCP-5675
Safe
~
medium confidence
SCP-5675
Expected annual
$2.9M
One-time setup
$2.7M
Annual recurring
$2.8M
Personnel
15
One-time setup and investigation costs are dominated by contingency, remediation, and initial forensic/research campaigns (total one-time ~ $2.65M). Recurring annual costs (~ $2.79M/yr) are driven primarily by personnel (field agents, embedded liaisons, and a dedicated research team), SOC operations, medical follow-up, legal/PR retainer, and community monitoring.
One-Time Capital Costs
Total: $2.7M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal, uneventful year: routine surveillance, research, medical follow-up, legal/PR retainers, monitoring and maintenance with no major incidents.
no new contaminated trucks
no mass-dispersal events
stable incarceration of PoI-5675
🚨
Minor Incident
$3.3M/yr
Localized recurrence: one contaminated sanitation vehicle or localized event requiring targeted seizure, forensic campaign, localized remediation and heightened PR/legal activity.
single truck triggers cognitohazard
localized cluster of symptomatic residents
need for targeted forensic/decon and PR response
🚨
Major Mass Dispersal
$7.8M/yr
Large-scale reactivation or deliberate mass-dispersal requiring city-wide amnestic deployment, mass medical surge, large-scale remediation and possible impound/destruction of municipal fleet.
widespread aerosol/airborne agent detected
multiple neighborhoods affected
need for mass amnestic deployment and large-scale remediation
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#1] Two 24-hour teams of 3 on duty (6 agents total), fully loaded ~$120k each. |
| Embedded Observer / Liaison Officer | 2 | [#2] Covert UIU/federal liaisons (2 officers) to monitor PoI-5675 and coordinate with UIU. |
| Research Scientist / PI and Researchers | 3 | [#14] PI + 2 research scientists included in research team salary pool (part of the 5-person research team). |
| Research Technician | 2 | [#14] Two technical staff supporting laboratory and field assays (part of the 5-person research team). |
| SOC Analyst (video/storage) | 1 | [#5] 0.5 FTE analyst for SOC video ingest/analysis (represented as one half-time position in budgeting). |
| Community Monitoring Analyst / OSINT | 1 | [#18] One FTE analyst for open-source monitoring and informant coordination. |
Confidence Notes
Analyst notes provide line-item estimates and ranges for most categories, allowing a mid-range build; uncertainty remains around large-event probabilities, range endpoints for one-time items, and classification-dependent acquisition costs (amnestics), so confidence is medium.