SCP-569
Euclid
~
medium confidence
SCP-569
Expected annual
$4.5M
One-time setup
$7.4M
Annual recurring
$4.3M
Personnel
22
Upfront capital and buildout are substantial (~$7.35M) driven by specialized containment infrastructure, LN2 aerosol systems, vehicles and reserves; recurring annual costs are dominated by staffing, insurance and contingency replenishment (~$4.29M/yr).
One-Time Capital Costs
Total: $7.4M
Annual Recurring Costs
Total: $4.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.3M/yr
Normal, uneventful year with routine operations, scheduled maintenance, and no major incidents.
no_breach
routine_maintenance
planned_research
🚨
Minor Incident
$4.6M/yr
Localized breach or aggressive instance event requiring targeted cleanup, limited medical treatment and partial equipment/panel replacement.
small_breach
limited_structural_damage
minor_medical_casualties
🚨
Major Incident
$5.8M/yr
Significant containment failure requiring large repairs, multiple medical evacuations, replacement of major systems, and legal/PR payouts.
multi-unit_breach
structural_repair
multiple_major_injuries
🚨
Catastrophic Breach
$14.3M/yr
Site-scale loss of containment, mass casualties or loss of facility requiring full rebuild, large legal settlements and long-term program scale-up or termination costs.
widespread_breach
structural_collapse
major_public_exposure
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#11] 24/7 dedicated security guards (8–12 FTE range in notes); headcount set to 10 FTE to match staffing budget midpoint. |
| Research Scientist | 4 | [#12] Scientists for behavior/material research (3–5 in notes); set to 4 FTE. |
| Containment Technician / Lab Technician | 5 | [#12] Technicians for daily maintenance, crate handling, grinding operations (4–6 in notes); set to 5 FTE. |
| Medical Officer | 3 | [#13] On-site medics for immediate treatment and medevac coordination (on-site team 120k–300k in notes); set to 3 FTE. |
Confidence Notes
Estimates use midpoints of analyst ranges and map each numbered note to cost categories; uncertainty remains around incident frequencies, contingency replenishment policy, and exact vehicle/asset counts so confidence is medium.