SCP-5746
Safe
~
medium confidence
SCP-5746
Expected annual
$39.3M
One-time setup
$182.1M
Annual recurring
$39.1M
Personnel
100
Estimated upfront capital (one-time) costs are dominated by secure Site-∞ construction, property acquisition, and decommissioning/reserve funds (hundreds of millions scale). Annual operating costs are driven by specialized staff wages, replacement/lifecycle reserve, cover/legal operations, and R&D/data analysis (~$30M–$50M/yr).
One-Time Capital Costs
Total: $182.1M
Annual Recurring Costs
Total: $39.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$39.1M/yr
Normal, uneventful year with routine operations, no incidents.
steady operations
no breaches
routine R&D and tests
🚨
Minor Incident
$40.6M/yr
Localized anomaly-related incident requiring medical care, short-term repairs, limited PR/legal actions.
operator medical event
localized contamination
small equipment failure
🚨
Major Breach
$59.1M/yr
Containment breach or significant anomalous event requiring large emergency response, replacement equipment, and legal settlements.
containment failure
major equipment loss
extended site remediation
🚨
Political Exposure
$49.1M/yr
Public/political exposure event forcing large-scale cover-up spending, bribery/lobbying, and high-profile legal defense.
local media exposure
government investigation
leak of facility existence
Personnel
100 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 40 | [#4] 24/7 manned security posts and patrol staff (site perimeter and internal). |
| MTF Agent | 30 | [#5] MTF-777 operational personnel and rotations authorized to operate SCP-5746-1. |
| Research Scientist | 20 | [#6] Physicists, neurologists, chronology specialists and data analysts working tests and analysis. |
| Medical Officer | 5 | [#12] On-site doctors/nurses for emergency care, MRI/fMRI coordination and staff health. |
| Administrative Staff | 3 | [#3, #16] Cover-story administration, payroll for shell company and legal/liaison administrative support. |
| D-class Management / Custodial | 2 | [#14] D-class recruitment/holding and custodial management personnel if D-class are used. |
Confidence Notes
Analyst notes provide detailed line items and ranges but many estimates are wide and dependent on policy choices (reserve sizing, depth of underground construction, retention volumes). Several anomaly-contingent costs are inherently uncertain, producing moderate confidence.