SCP-5776
Unknown
?
low confidence
SCP-5776
Expected annual
$65.0M
One-time setup
$1.4B
Annual recurring
$44.3M
Personnel
74
Initial one-time capital requirements are dominated by large contingency reserves and specialized hardware/dev work (anchoring device + cell retrofit), producing an estimated one-time need of roughly $1.37B. Baseline annual operating costs are driven by research, continuous monitoring, staffing and contingency-maintenance, approximately $44.3M/yr, with low-probability scenarios (major or catastrophic breaches) capable of adding hundreds of millions to many billions in a single year.
One-Time Capital Costs
Total: $1.4B
Annual Recurring Costs
Total: $44.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$44.3M/yr
Normal, uneventful year—containment intact, routine operations and scheduled R&D/maintenance only.
no containment failures
routine maintenance
scheduled R&D activity
🚨
Minor Incident
$49.3M/yr
Localized containment event requiring tactical response, cleanup and witness relocation but containment retained or quickly re-established.
localized breach
small-scale contamination
rapid tactical recapture
🚨
Major Breach
$544.3M/yr
Significant containment failure requiring large-scale mobilization, regional evacuations, extended clean-up and heavy expenditure of contingency funds.
extended breach
regional infrastructure damage
multi-day military/civil mobilization
🚨
Catastrophic Breach
$10.0B/yr
XK-class or existential-grade event forcing full national/international mobilization, potentially multi-billion-dollar weekly operations to attempt containment or mitigation.
uncontrolled global spread
XK-class escalation
nationwide evacuation / military mobilization
Personnel
74 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 28 | [#8] 24 front-line guards across three shifts plus senior supervisors; wages included in staff_wages. |
| Research Scientist | 16 | [#11, #12] Specialist xenobiology/reality-physics/memetics researchers; included in research staff salary pool. |
| Technician / Lab Assistant | 6 | [#11] Technical staff and lab technicians supporting experiments and maintenance; included in research staffing estimates. |
| Medical Officer | 4 | [#17] On-site medics and trauma/psychiatric support staff; staffing costs included in staff_wages and medical recurring costs. |
| Engineer / Maintenance | 3 | [#4, #6, #22] Engineers responsible for power, robotics/harnessing and systems maintenance contracts. |
| Tactical Operator / Rapid Response | 12 | [#9] Members of the tactical recapture team maintained on-site / on-call; equipment and operations accounted separately. |
| Administrative Staff | 4 | [#15, #32] Administrative, legal-liaison and program support staff; overhead included in administrative_overhead and cover_story_and_legal. |
| Site Director / Executive Staff | 1 | [#26] Single executive-level oversight for program coordination and cross-agency liaison. |
Confidence Notes
Estimates are based on analyst ranges and program-level judgment; SCP-5776's existential and anomalous nature creates large uncertainties (wide cost ranges and heavy dependence on low-probability, high-impact events).