SCP-5785
Keter
~
medium confidence
SCP-5785
Expected annual
$3.1M
One-time setup
$7.4M
Annual recurring
$3.0M
Personnel
9.25
Initial one-time setup is dominated by construction and contingency reserves (vacuum chamber, cell retrofit, engineering/certification), totaling several million; annual recurring costs (~$3.0M/year) are driven by medical/security staffing, MTF readiness, and a sustained research program.
One-Time Capital Costs
Total: $7.4M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Normal operational year with no major incidents; routine staffing, maintenance, research, and readiness expenses only.
no consciousness-change events
no breaches or public exposure
routine maintenance and research
🚨
Minor Incident
$3.2M/yr
One or more limited consciousness-change events requiring MTF mobilization, emergency sedation, overtime, cleanup, and short-term legal/PR response.
consciousness change / targeting staff
single MTF mobilization and emergency response
localized contamination requiring cleanup
🚨
Major Breach
$6.0M/yr
Large containment failure or public-exposure event requiring extensive emergency response, legal settlements, large-scale public-health measures, and major PR/legal expenditure.
containment failure with public exposure
major legal/settlement obligations
large-scale emergency response
Personnel
9.25 total
| Role | Count | Notes |
|---|---|---|
| Registered Nurse (RN) | 3 | [#5] Minimum 24/7 skilled nursing coverage (3 shift-equivalents) to maintain comatose subject; includes benefits and backfill. |
| Medical Officer / Attending Physician | 0.25 | [#5] Pro-rated 0.25 FTE physician oversight for ICU/medical oversight and periodic consults. |
| Security Officer / MTF Agent | 6 | [#6] Dedicated guards stationed at the cell (6 FTE) with appropriate clearances and anomalous-bio training. |
Confidence Notes
Analyst notes provide detailed line items and ranges but many items have wide variances (e.g., vacuum chamber, MTF readiness, legal settlements, contingency reserve). Estimates use midpoint assumptions and standard operational mappings; significant uncertainty remains around frequency/severity of incidents and potential large one-time settlement costs.