SCP-5798
Unknown
~
medium confidence
SCP-5798
Expected annual
$1.4M
One-time setup
$3.3M
Annual recurring
$1.4M
Personnel
10
First-year setup and acquisition costs are dominated by property purchase and one-time containment engineering; total one-time expenses are roughly $3.33M. Recurring annual costs (~$1.42M/yr) are driven primarily by security staffing and ongoing research/monitoring.
One-Time Capital Costs
Total: $3.3M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with no major incidents; standard staffing, monitoring, and research operations.
no incidents
routine maintenance
scheduled research activity
🚨
Minor Incident
$1.5M/yr
Localized equipment failure, small contamination event, or single-person injury requiring medical care and repairs.
camera/UPS failure
minor contamination detected
non-life-threatening injury
🚨
Major Breach
$2.0M/yr
Significant breach or entanglement event requiring MTF activation, medical evacuations, major repairs and PR/legal actions.
partial containment breach
serious staff injury
localized structural remediation
🚨
Catastrophic Breach
$3.2M/yr
Full-scale decision to remove/neutralize organism or uncontrolled large breach requiring demolition, extensive decontamination, and relocation.
decision to exterminate
major uncontrolled spread
mass-casualty event
🚨
Research Breakthrough Requiring Scale Up
$1.7M/yr
Discovery of new properties or sapience-driven engagement requiring expanded research, additional staff, or lab upgrades.
confirmed sapience and interaction program
novel biological discoveries
grant-funded scale-up
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#4] Eight guards to provide 24/7 coverage (six for shift coverage + float/leave). |
| Research Scientist | 2 | [#11] Two research/containment scientists dedicated or rotating on SCP-5798-related studies (salary included in staff_wages). |
Confidence Notes
Notes provide detailed line items and ranges enabling a reasoned cost model, but many items (contingencies, remediation, and decision-driven demolitions) are inherently uncertain, producing only medium confidence in totals.