SCP-5830
Unknown
~
medium confidence
SCP-5830
Expected annual
$20.5M
One-time setup
$10.1M
Annual recurring
$19.1M
Personnel
118
Estimated initial capital of approximately $10.1M for remote outposts, vehicles, generators and research build-out; recurring annual operating costs roughly $19.15M driven primarily by continuous armed staffing and reliable arctic airlift/medevac logistics.
One-Time Capital Costs
Total: $10.1M
Annual Recurring Costs
Total: $19.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$19.1M/yr
Normal operational year with no major incidents; routine staffing, logistics, monitoring and scheduled missions.
no breaches
normal mission cadence
routine maintenance
🚨
Minor Incident
$21.1M/yr
Localized incident such as an unauthorized entry, limited breach or small-scale environmental incident requiring extra medevac, repairs and legal/diplomatic actions.
unauthorized entry
small structural damage
limited contamination or medical evacuations
🚨
Major Breach
$34.1M/yr
Significant containment breach or multi-causal incident (multiple exitees, casualty event, heavy asset loss or major environmental spill) requiring large-scale emergency response and replacement of capital assets.
multiple unauthorized exits
loss of key equipment
international political exposure
Personnel
118 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 75 | Primary on-site armed guard complement (note #1 mandates no fewer than 20 present; staffing rotation and supervisors yields ~75 FTE). |
| Navigator / Level-4 Researcher | 6 | Rosters of cleared navigators for entry missions and rotation (note #2). |
| Research Scientist | 16 | Scientific staff for R&D and long-term study programs; accounts for part of recurring R&D budget (#20). |
| Engineer / Maintenance | 8 | Facility, power and vehicle maintenance staff for arctic systems and gensets (supports #8, #9). |
| Medical Officer | 2 | On-site paramedic/medical capability and liaison to medevac services (note #12). |
| Lab Technician | 6 | Technicians for imaging, cataloging and routine analysis of in-situ artifacts (notes #28, #11). |
| Administrative Staff | 4 | Record-keeping, secure evidence management and local liaison administration (notes #13, #27). |
| Site Director / Executive Staff | 1 | Overall site/program leadership and diplomatic liaison. |
Confidence Notes
Estimates are grounded in detailed arctic logistics, staffing and equipment notes provided by the analyst, but many items (frequency of missions, split of medevac vs staffing costs, charter vs purchase of transport) required judgement calls and median selections; geopolitical/legal costs and contingency sizing are uncertain, yielding medium confidence.