SCP-5842
Keter
~
medium confidence
SCP-5842
Expected annual
$3.7M
One-time setup
$7.8M
Annual recurring
$3.6M
Personnel
26
One-time setup and contingency reserves total approximately $7.78M, with recurring annual operating costs ~ $3.57M driven mainly by staffed rapid-response, operations center staffing, and legal/cover-story programs.
One-Time Capital Costs
Total: $7.8M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal year with occasional local appearances contained quickly; routine operations and monitoring only.
occasional single-location sightings
no expansion outside Wellington
no major public incident
🚨
Minor Incident
$3.8M/yr
Increased local activity leading to extra overtime, vehicle deployments, repairs, modest PR/legal surge, and higher reimbursements.
clustered appearances in Wellington
vehicle damage or public-safety incident
heightened local media attention
🚨
Major Expansion
$8.6M/yr
SCP begins appearing across multiple cities/regions requiring duplication of teams/assets and high operational scale-up.
multi-city sightings
rapid geographic spread
need to stand up regional monitoring hubs
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Rapid Response MTF (local) | 12 | [#1] One dedicated 12-person on-call team (operators, containment techs, vehicle crew, guards). |
| Operations Center / Dispatch Staff | 6 | [#8] 24/7 ops center shift staffing (dispatchers/operators). |
| Data Analysts | 3 | [#10] Pattern analysis and appearances modelling. |
| Systems Administrator | 1 | [#10] Cloud/IT/sysadmin support for analytic systems and SOC. |
| Research Scientist / Lab Technician | 1 | [#11] Short-term testing and materials analysis coordination. |
| Media Monitoring / Social Intelligence Analyst | 1 | [#20] Monitoring local social media and reporting. |
| Engineer / Maintenance | 1 | [#6, #2] Equipment and vehicle maintenance support. |
| Administrative Staff / Liaison | 1 | [#12, #13, #14] Legal/PR liaison and municipal coordination. |
Confidence Notes
Analyst notes provided explicit line-item estimates and ranges, enabling a medium-confidence budget; large reserves and escalation scenarios (items #19, #24, #25, #27) are inherently uncertain and could materially change totals.