SCP-5841
Unknown
?
low confidence
SCP-5841
Expected annual
$8.7M
One-time setup
$31.4M
Annual recurring
$8.3M
Personnel
42
Estimated initial one-time capital/setup costs are approximately $31.4M driven primarily by tenant compensation, contingency reserves, and EM/shielding/structural work; ongoing annual operating costs are approximately $8.25M/yr driven by security staffing, specialist staff, utilities (electricity), and legal/cover operations.
One-Time Capital Costs
Total: $31.4M
Annual Recurring Costs
Total: $8.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.3M/yr
Normal year with routine operations, maintenance, staffing and monitoring but no major incidents.
no breach
routine maintenance
regular staffing rotations
🚨
Minor Incident
$8.8M/yr
Localized breach or containment event requiring additional cleanup, short-term overtime, legal/PR response and modest repairs.
small breach
local media exposure
targeted cleanup/repairs
🚨
Major Breach
$13.8M/yr
Significant containment breach requiring heavy remediation, large-scale forensic work, vehicle losses, major legal/settlement costs and partial structural work.
widespread breach
vehicle/asset loss
large legal/settlement exposure
🚨
Catastrophic Breach
$28.3M/yr
Full-scale escalation: structural demolition or removal, major public exposure, mass legal liability and extensive remediation/relocation operations.
uncontrolled mass breach
public disclosure
need for demolition/complete relocation
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 27 | [#1] 24 perimeter guards + 3 supervisors providing 24/7 armed coverage. |
| Rapid Reaction / Tactical Containment Team | 6 | [#2] On-call tactical team trained for containment/recontainment and electrical-hazard protocols. |
| Research Scientist | 8 | [#3] Electrical engineers, cyber/controls specialists, forensic pathology and anomalous-behavior researchers. |
| CCTV / Monitoring Staff | 1 | [#10] 24/7 video/sensor monitoring operator (core monitoring headcount represented in staff wages). |
Confidence Notes
Large ranges and unknowns in the analyst notes (anomalous continuous power draw, uncertain efficacy of EM shielding, possible structural removal, and speculative memetic/amnestic costs) make these order-of-magnitude estimates approximate; contingency assumptions drive much of the one-time total.