SCP-5841 Unknown ? low confidence
SCP-5841
Expected annual
$8.7M
One-time setup
$31.4M
Annual recurring
$8.3M
Personnel
42
Estimated initial one-time capital/setup costs are approximately $31.4M driven primarily by tenant compensation, contingency reserves, and EM/shielding/structural work; ongoing annual operating costs are approximately $8.25M/yr driven by security staffing, specialist staff, utilities (electricity), and legal/cover operations.
🏗️ One-Time Capital Costs Total: $31.4M
Facilities $7.8M
[#5, #8, #9, #19, #20] Faraday/EM retrofit, HVAC isolation retrofit, perimeter hardening, heavy-lift/structural modification, and Site-15 receiving-site retrofits aggregated (retrofits, structural work, commissioning).
Tenant Compensation One Time $6.0M
[#12] Lump-sum tenant/business compensation, lost rent and relocation assistance.
Contingency Reserve Escalation One Time $6.0M
[#27] Dedicated contingency/reserve for unanticipated large-scale escalation (mothball / demolition / settlements).
Contingency Reserve Small One Time $3.0M
[#23] Contingency/claims reserve (medium-size, initial).
Amnestic Program One Time $2.8M
[#14] Placeholder/specialized medical/amnestic program initial capitalization (fictional-tech budgeting).
Equipment $2.1M
[#4, #6, #10, #17, #18, #22] Remote reconnaissance systems, power isolation hardware/generators, CCTV/sensors, PPE initial kit-out, secure transport vehicle(s), and communications hardware.
Initial Research And Lab Setup $1.5M
[#15, #21, #28] Forensic cold-storage / cataloging, initial neutralization research program startup, and contracted data-analysis/simulation procurement.
Witness Compensation One Time $1.1M
[#14] Witness relocation/NDAs/settlements initial budget (non-pharmacological/legal).
Community Mitigation One Time $400K
[#29] Community payments, mitigation measures, and local economic impact responses.
Legal And Permitting One Time $300K
[#11] Initial legal/permitting/municipal coordination and cover-story setup costs.
Public Relations One Time $275K
[#13] Initial PR/media-blackout, paid statements, and social-media mitigation.
Decontamination One Time $150K
[#16] Major decontamination and hazardous-waste disposal for initial operation.
Training Initial One Time $100K
[#25] Initial curriculum development and tabletop/exercise setup.
🔄 Annual Recurring Costs Total: $8.3M/yr
Staff Wages $3.5M/yr
[#1, #2, #3, #10] Perimeter security (24 guards + 3 supervisors), RRT (6 operators), site scientists/engineers (approx. 8 FTE), and monitoring staff wages.
Logistics And Transport $1.1M/yr
[#18, #24] Transport readiness/escorts/permits (on-call), plus staff housing/travel/per-diem/local logistics for rotating teams.
Cover Story And Legal $1.0M/yr
[#11, #13, #14, #23] Ongoing legal support/municipal liaison, PR operations, witness-management/amnestic program operating costs, and insurance premiums.
Facilities Maintenance $680K/yr
[#6, #8, #26] Power-isolation and generator maintenance, HVAC filter/replacement and selective ventilation upkeep, and long-term site inspection/maintenance.
Contingency Replenishment $500K/yr
[#27] Annual replenishment of contingency/reserve to maintain readiness for escalation.
Research And Monitoring $400K/yr
[#21, #28, #15] Ongoing neutralization/testing budget, contracted external expertise and modeling, and recurring forensic analyses/monitoring consumables.
Electricity Consumption $314K/yr
[#7] Estimated annual electricity supply and demand charges for anomaly draw (modeled midpoint + demand charges).
Supplies And Consumables $265K/yr
[#4, #15, #16, #17] Robotics spare parts & repairs, forensic consumables and tests, hazardous-waste/decon consumables, PPE replenishment and replacement.
Site15 Additional Staffing $200K/yr
[#20] Incremental staffing/utilities if object is transferred to Site-15 (proportional ongoing costs).
Communications And Data Recurring $60K/yr
[#22] Encrypted comms services, fiber leases, redundant storage maintenance and telemetry service fees.
Documentation And Archival $60K/yr
[#30] Ongoing documentation, audit, archival storage and chain-of-custody recordkeeping.
Cctv Storage $50K/yr
[#10] Video storage, archive access and monitoring SaaS/storage fees.
Training And Drills $40K/yr
[#25] Recurring training, drills and tabletop exercise costs.
Cost Scenarios
📊 Baseline (baseline) $8.3M/yr
85.0% probability / year
Normal year with routine operations, maintenance, staffing and monitoring but no major incidents.
no breach routine maintenance regular staffing rotations
🚨 Minor Incident $8.8M/yr
10.0% probability / year +$500K vs baseline
Localized breach or containment event requiring additional cleanup, short-term overtime, legal/PR response and modest repairs.
small breach local media exposure targeted cleanup/repairs
🚨 Major Breach $13.8M/yr
4.0% probability / year +$5.5M vs baseline
Significant containment breach requiring heavy remediation, large-scale forensic work, vehicle losses, major legal/settlement costs and partial structural work.
widespread breach vehicle/asset loss large legal/settlement exposure
🚨 Catastrophic Breach $28.3M/yr
1.0% probability / year +$20.0M vs baseline
Full-scale escalation: structural demolition or removal, major public exposure, mass legal liability and extensive remediation/relocation operations.
uncontrolled mass breach public disclosure need for demolition/complete relocation
👥 Personnel 42 total
Role Count Notes
Security Officer / MTF Agent 27 [#1] 24 perimeter guards + 3 supervisors providing 24/7 armed coverage.
Rapid Reaction / Tactical Containment Team 6 [#2] On-call tactical team trained for containment/recontainment and electrical-hazard protocols.
Research Scientist 8 [#3] Electrical engineers, cyber/controls specialists, forensic pathology and anomalous-behavior researchers.
CCTV / Monitoring Staff 1 [#10] 24/7 video/sensor monitoring operator (core monitoring headcount represented in staff wages).
📋 Confidence Notes
Large ranges and unknowns in the analyst notes (anomalous continuous power draw, uncertain efficacy of EM shielding, possible structural removal, and speculative memetic/amnestic costs) make these order-of-magnitude estimates approximate; contingency assumptions drive much of the one-time total.
← SCP-5840 ↑ All SCPs SCP-5842 →