SCP-585
Safe
~
medium confidence
SCP-585
Expected annual
$487K
One-time setup
$1.9M
Annual recurring
$478K
Personnel
5
One-time setup costs are dominated by a large decommissioning contingency and disposal/containment equipment, totaling roughly $1.9M; annual operations run under $500k driven mainly by staff/security, ongoing research, medical readiness and hazardous disposal.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $478K/yr
Cost Scenarios
📊
Baseline
(baseline)
$478K/yr
Normal operational year with routine testing within approved limits and no major incidents.
routine_testing
scheduled_maintenance
regular_training
🚨
Minor Incident
$503K/yr
Small containment incident (e.g., personnel puncture, localized contamination, or accidental over-rotation) requiring medical treatment, legal reimbursement and limited equipment replacement.
accidental_puncture
small_disposal_event
minor_equipment_replacement
🚨
Major Breach
$878K/yr
Significant breach or experimental failure causing vault damage, large-scale cleanup, staff injuries and major equipment replacement.
containment_breach
structural_damage
multiple_injuries
🚨
Decommissioning Event
$1.7M/yr
Policy-driven or emergency permanent neutralization/decommissioning requiring specialized vitrification/plasma destruction or long-term off-site secure storage.
policy_decommission
irreversible_escalation
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 1 | [#4] Day-to-day handling, logging and maintenance; salary included in staff_wages. |
| Research Scientist / Lead Researcher | 1 | [#4] Experiment approvals, SOP compliance and research oversight; salary included in staff_wages. |
| Security Officer / MTF Agent | 3 | [#5] 24/7 coverage model (2–4 guards); count chosen to match security salary estimate used in recurring costs. |
Confidence Notes
Line items are well-described in the analyst notes but many figures are given as ranges and several optional approaches (incineration vs encapsulation, decommissioning methods) create substantial variance; estimates use midpoints and selected options.