SCP-5908
Unknown
~
medium confidence
SCP-5908
Expected annual
$1.0M
One-time setup
$1.4M
Annual recurring
$978K
Personnel
4
Estimated one-time setup and contingency costs are approximately $1.45M, driven by containment upgrades, large contingency and potential R&D/forensic reserves; recurring costs are about $978k/yr, driven primarily by cover-story/legal operations and staff/security.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $978K/yr
Cost Scenarios
📊
Baseline
(baseline)
$978K/yr
Normal operational year with no major incidents; routine containment, conservation, staffing, and cover operations continue.
no incidents
routine maintenance
ongoing cover operations
🚨
Minor Incident
$1.0M/yr
Small security or conservation incident (attempted unauthorized access, minor corrosion event, or single legal action) requiring emergency response and one-off legal/forensic expenses.
unauthorized access attempt
minor accidental activation
single-local legal action
🚨
Political Exposure
$1.5M/yr
Public exposure or credible threat to exhume/inspect remains triggers large legal battles, expanded PR/cover operations, and increased security for the year.
public campaign to exhume
major FOIA/media push
local legal challenge
🚨
Major Breach
$2.0M/yr
Significant containment breach or anomalous activation (e.g., firing with uncontrolled effects) requiring forensic searches, large-scale response, and potential settlements/research mobilization.
anomalous activation
containment breach
evidence of external exposure
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Collections Manager / Curator | 1 | [#3] Dedicated artifact curator responsible for chain-of-custody and conservation (1 FTE). |
| Security Officer / MTF Agent | 3 | [#4] Security augmentation for vault coverage (modeled as 3 FTE within the 2–4 guard estimate). |
Confidence Notes
Analyst notes provide itemized ranges for most costs, enabling mid-range estimates; however large contingencies, R&D scope, and frequency of legal/cover operations are highly policy-dependent, producing residual uncertainty.