SCP-5941
Thaumiel
~
medium confidence
SCP-5941
Expected annual
$37.1M
One-time setup
$343.1M
Annual recurring
$32.4M
Personnel
133
One-time capital costs are dominated by construction and contingency reserves (~$343M total); recurring annual operating costs are roughly $32.4M/yr driven by personnel wages, cover/legal operations, utilities and maintenance.
One-Time Capital Costs
Total: $343.1M
Annual Recurring Costs
Total: $32.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$32.4M/yr
Normal uneventful year with routine maintenance and operations.
routine_operations
scheduled_maintenance
🚨
Major Geotechnical Repair
$38.4M/yr
Occasional major repair campaign to the labyrinth/subsurface structures (grout injection, large-scale stabilization).
cave-in
water_ingress
microseismic_event
🚨
Breach And Emergency Response
$102.4M/yr
Containment breach or thaumic escalation requiring large-scale mobilization, international/legal response and extensive remediation.
PoI_containment_failure
memetic_or_dimensional_breach
major_site_compromise
Personnel
133 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 100 | [#3] Site garrison and response teams; used the analyst estimate of ~100 personnel for recurring wage cost calculation. |
| Senior Staff / Specialists | 15 | [#5] Site director, containment head, lead thaumaturgists/archaeologists and senior medical staff (10–20 estimated; midpoint used). |
| Research Scientist / Technician | 15 | [#6] Baseline monitoring, archival work and contingency research staff retained on-site. |
| Medical Officer | 3 | [#7] Full-time medics plus part-time specialists (2–4 FTE range; midpoint used). |
Confidence Notes
Estimates are mid-range selections from wide analyst ranges and include discretionary reserve assumptions; the anomalous nature of SCP-5941 and political/archaeological variables introduce meaningful uncertainty.