SCP-5978
Unknown
~
medium confidence
SCP-5978
Expected annual
$2.5M
One-time setup
$2.0M
Annual recurring
$2.4M
Personnel
21
Estimated one-time response, neutralization and facility setup costs are approximately $1,995,000; ongoing annual operations are approximately $2,405,000 per year, driven primarily by staff wages/security, research and monitoring, and a rapid-response retainer.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal, uneventful year of active containment and monitoring with no major incidents.
steady containment
routine monitoring
no breaches or major legal events
🚨
Minor Incident
$2.7M/yr
Small-scale containment incident requiring localized medical response, repairs and limited PR/legal action.
localized breach
medical treatment of staff
minor containment repairs
🚨
Major Breach
$3.6M/yr
Significant containment failure or public exposure requiring large-scale response, replacement facilities, long-term remediation and legal settlement.
multi-person breach
public exposure/legal action
facility repairs or rebuild
🚨
Research Breakthrough Scaleup
$2.9M/yr
Decision to retain SCP-5978 for expanded long-term research and scale up personnel, facilities and experiments.
scientific priority
new grant or directive to expand study
need for animal models/expanded sequencing
🚨
Legal Exposure
$2.8M/yr
Costly legal/PR incident resulting in settlements, larger-scale cover operations and extended witness management.
lawsuit or public leak
tenant litigation
regulatory investigation
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#2] 12–18 armed guards plus supervisory coverage for 24/7 containment. |
| Research Scientist | 3 | [#3, #14] Containment scientists dedicated to monitoring, experiments and analysis. |
| Medical Officer / Veterinarian / Med-Tech | 3 | [#3] Pathologist/veterinarian and med-techs for imaging, wound care and sample processing. |
| Lab Technician / Containment Technician | 1 | [#3] Lab/containment tech for day-to-day operations and sample handling. |
Confidence Notes
Analyst notes provide line-item ranges but many costs depend on mission choices (neutralization vs prolonged containment), local vendor access and site specifics; quantities are defensible mid-range estimates rather than precise bids.