SCP-5989
Keter
~
medium confidence
SCP-5989
Expected annual
$113.8M
One-time setup
$216.5M
Annual recurring
$104.0M
Personnel
190
Initial one-time buildout and mass-production of living replacements dominate costs (~$216.5M one-time), while ongoing upkeep of clones, specialized staff and extensive mnestic workflows are the main recurring drivers (~$104.0M/yr baseline). Contingency and high-risk incident responses can push annual costs far higher.
One-Time Capital Costs
Total: $216.5M
Annual Recurring Costs
Total: $104.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$104.0M/yr
Normal operational year: routine research, maintenance, clone upkeep, mnestic workflows and standard operations without major incidents.
no_breach
steady_operational_tempo
routine_research
🚨
Minor Incident
$124.0M/yr
Localized breach or targeted sabotage causing loss of a subset of clones and requiring emergency replacement, legal/PR response and field operations.
localized_breach
targeted_infohazard_leak
limited_clone_loss
🚨
Major Breach
$239.0M/yr
Catastrophic containment failure or hostile action (e.g., PoI attack) destroying large portions of infrastructure and clones, requiring facility rebuild and mass replacement.
site_destruction
mass_clone_loss
large_scale_neutralization_ops
Personnel
190 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 10 | [#9] Senior scientists to design cloning protocols, gene therapies and accelerated-growth regimens (10 senior scientists). |
| Lab Technician / Medical Tech / Nursing Staff | 40 | [#10] Technical workforce to run production lines, tissue handling and clone care (staffing sized to match $3.0M/yr estimate). |
| Security Officer / MTF Agent | 100 | [#11] Site guards and specialized personnel trained for memetic/infohazard conditions (100 guards @ $60k/yr wages). |
| Mnestic Administration / Medical Monitoring Staff | 40 | [#8] Physicians, psychiatrists and monitoring staff for mnestic administration and handling side-effects (aggregated in $4.0M/yr mnestic admin budget). |
Confidence Notes
Analyst notes provide many explicit line-item estimates enabling a detailed build, but key assumptions remain (number of clones, amortization, incident frequencies and unpredictable infohazard-driven nonlinear costs), so estimates are moderately confident.