SCP-6020
Unknown
~
medium confidence
SCP-6020
Expected annual
$30.1M
One-time setup
$77.3M
Annual recurring
$29.8M
Personnel
270
Upfront capital and land control are the main costs (~$77.3M one-time), driven by land acquisition, site/building works, and contingency; ongoing annual operations are labor- and services-heavy (~$29.8M/yr), driven by security, gardening workforce, and site overhead.
One-Time Capital Costs
Total: $77.3M
Annual Recurring Costs
Total: $29.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$29.8M/yr
Normal operational year with no major incidents; routine staffing, maintenance, and monitoring.
no_incident
routine_operations
🚨
Wildfire Event
$34.8M/yr
Seasonal wildfire or large localized fire affecting planted buffer and requiring emergency suppression, replanting, and repairs.
wildfire
extended_fire_suppression
🚨
Rapid Expansion
$34.8M/yr
Anomalous expansion of SCP-6020-A requiring rapid land acquisition/fencing and scaling of staff.
sudden_radius_increase
urgent_land_acquisition
Personnel
270 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 200 | [#8] 24/7 perimeter and internal security staffing (150–300 total); model uses ~200 guards including supervisors and QRT. |
| Gardener / Ritual Staff | 48 | [#12] Dedicated gardening/worship workforce (32–64 staff) responsible for frequent manual activities that maintain SCP-6020-A diameter. |
| Research Scientist | 6 | [#13, #15] Botanical/genetics/archaeology research staff required for study and monitoring of anomalous flora and cultural remains. |
| Medical Officer | 4 | [#14] Onsite medical and psychiatric staff for occupational health and SCP-sensitive wellbeing services. |
| Engineer / Maintenance | 6 | [#11, #17] Facilities, power, vehicles and grounds technical staff for maintenance and equipment operations. |
| Administrative Staff | 6 | [#32, #20] Site admin, HR, procurement, and classified-records staff supporting operations and cover-story maintenance. |
Confidence Notes
Line items are drawn from detailed analyst notes with explicit ranges; the largest uncertainties are local land prices, long-term staffing/posture choices, and unpredictable anomalous behavior (expansion/contraction), so a medium confidence rating is appropriate.