SCP-6022 Euclid ~ medium confidence
SCP-6022
Expected annual
$16.3M
One-time setup
$67.3M
Annual recurring
$15.5M
Personnel
72
Estimated one-time capital costs are approximately $67.3M driven by site build, emergency stockpiles, land acquisition and a large contingency reserve; ongoing annual costs are approximately $15.53M driven primarily by staff wages, BSL‑4 access / research, logistics and cover-story/liaison operations.
🏗️ One-Time Capital Costs Total: $67.3M
Contingency Reserve Catastrophic $20.0M
[#30] One-time contingency reserve for catastrophic SCP-6022-4 events and national-level emergency measures (held in reserve for major activations).
Facilities $11.7M
[#2, #5, #14] Site-6022 modular reinforced compound, quarantine suite build-out, and watch towers (site construction, towers, basic hardening).
Emergency Stockpile Setup $10.0M
[#16] Dedicated rapid-response stockpile and mobile teams (pre-staged mobile hazmat, mass amnestics, barriers, incineration staging).
Land Acquisition $10.0M
[#18] Partial land purchase / easements or government buy-in to remove public access to ~100 km² (baseline mid-range estimate).
Initial Research And Lab Setup $5.0M
[#6, #28, #23] Initial on-site laboratory buildout, secure sample archive / cold-chain setup, and initial long-term R&D program setup (modest baseline R&D capability).
Helicopter And Heavy Equipment Purchase $4.0M
[#15] Purchase of helicopters/airlift-capable craft and ground heavy equipment (dozers, transport) for rapid response and perimeter hardening.
Equipment $3.5M
[#1, #11, #25, #20, #13, #23] Armored patrol vehicles and vehicle outfitting, memetic-proof servers/hardened viewing suite, SATCOM & hardened comms hardware, EMI hardening equipment, hardened remote sensors, cold storage hardware.
Legal Cover Setup $2.0M
[#17] Initial legal/PR setup, local government liaison, cover-story infrastructure and contracts.
Incinerator Purchase $600K
[#7] Mobile high-temperature incinerator / contracted facility buyout for Class IV biological disposal.
Hazmat Suit Stockpile $500K
[#8] Initial procurement of 50 Class-V hazmat suits and storage for immediate response.
Bsl4 Construction $0
[#6] Dedicated BSL-4 construction not selected in baseline; recurring BSL-4 access used instead.
🔄 Annual Recurring Costs Total: $15.5M/yr
Staff Wages $6.5M/yr
[#1, #3] Payroll for continuous staffing: MTF patrol operators (36+6 backups) and on-site personnel (approx. 30 FTE) and associated shift/hazard pay.
Stockpile Refresh And Readiness $1.5M/yr
[#16] Annual refresh of mass amnestic stock, mobile hazmat consumables, replenishment of emergency caches and rapid-response team readiness costs.
Research And Monitoring $1.2M/yr
[#6, #11, #12, #22, #28] Recurring costs for BSL-4 access / sample transfers, memetic monitoring operations, satellite tasking/analysis, and small forensic/cryptographic team operations (baseline R&D running costs limited).
Decontamination And Remediation $1.0M/yr
[#26] Routine budgeting for small-scale decon events and reserve for larger remediation work if needed.
Long Term Rnd $1.0M/yr
[#28] Modest ongoing R&D into antiprionic therapeutics and memetic countermeasures (baseline limited program).
Logistics And Transport $900K/yr
[#1, #15, #7, #12] Vehicle fuel & maintenance for patrols, emergency airlift contract standby, routine transport for contaminated material to incineration facilities, and tasking-related transport costs.
Cover Story And Legal $800K/yr
[#17, #19, #24, #27] Ongoing cover-story operations, local liaison, web-mapping suppression contracts, legal/PR retouching and small clandestine payments/contingencies.
Supplies And Consumables $600K/yr
[#5, #7, #8, #10] PPE consumables/sterilization supplies, per-incident incineration consumables, and baseline amnestic dose production/administration (per-dose costs aggregated into supplies).
Red Team Opsec $600K/yr
[#29] OPSEC / red-team, leak prevention, drone interdiction and takedown operations.
Facilities Maintenance $500K/yr
[#2, #14, #20, #25, #13, #15] Site and tower upkeep, generator & power maintenance, EMI/hardening repairs, comms/SATCOM operations, and sensor maintenance.
Medical And Emergency Care $400K/yr
[#9] Hospitalization, trauma care, emergency medical response budgeting for survivors and exposed personnel (ICU, prosthetics where applicable).
Training And Drills $225K/yr
[#4] Specialized memetic/hazmat/prion handling training, instructors, recurring drills and psychological screening.
Psychological Services $225K/yr
[#21] On-call psychologists, memetic aftercare, PTSD programs and long-term monitoring for exposed personnel.
Prosthetics And Cover Records $100K/yr
[#27] Prosthetics, staged medical records, and administrative/legal package costs to support cover stories for survivors.
Cost Scenarios
📊 Baseline (baseline) $15.5M/yr
74.0% probability / year
Normal operational year with no major incident; routine patrols, monitoring, training, and replenishment.
no SCP-6022-4 amplitude exceedance routine patrols and monitoring only
🚨 Minor Incident $16.3M/yr
20.0% probability / year +$800K vs baseline
Localized SCP-6022-2 or SCP-6022-3 incident requiring quarantine, medical care, incineration and additional legal/cover operations.
single driver exposure (SCP-6022-2) with infection/quarantine small-scale incineration and prosthetic/cover payouts
🚨 Major Breach $20.5M/yr
5.0% probability / year +$5.0M vs baseline
A SCP-6022-4 event requiring enactment of Procedure 6022-Thysia, broad incineration/quarantine, mass amnestics and significant remedial action.
SCP-6022-4 amplitude exceedance >20m enactment of Procedure 6022-Thysia and multi-unit response
🚨 Catastrophic Breach $50.5M/yr
1.0% probability / year +$35.0M vs baseline
Large-amplitude SCP-6022-4 activation with cascading catastrophic effects (national-level response, mass remediation, drawing contingency reserve).
extreme SCP-6022-4 activation failure/delay of Procedure 6022-Thysia, large-scale secondary disasters
👥 Personnel 72 total
Role Count Notes
Security Officer / MTF Agent 42 36 active patrol operators plus 6 backup/maintenance staff for 24/7 perimeter patrols; hazard pay included in staff_wages. [#1]
Site Security / Guards 13 On-site guards included in the 24/7 staffing complement at Site-6022. [#3]
Research Scientist 4 Field researchers and laboratory staff for monitoring and small-scale R&D. [#3, #22]
Medical Officer 2 On-site medics for immediate care and amnestic administration. [#3, #10]
Engineer / Maintenance 6 Maintenance staff for vehicles, generators, sensors, and site infrastructure. [#1, #2, #13]
Administrative Staff 4 Site manager, admin and liaison personnel handling documentation, cover stories and coordination. [#3, #17]
Site Director / Executive Staff 1 Site manager / senior on-site executive. [#3]
📋 Confidence Notes
Analyst notes provide detailed line items and ranges but many costs depend on policy choices (land acquisition vs. government buy-in, building vs. leasing BSL-4, size of contingency reserves) and on the anomaly's unpredictable activation frequency; therefore estimates are moderately confident but could vary widely.
← SCP-6021 ↑ All SCPs SCP-6023 →