SCP-6070 Keter ~ medium confidence
SCP-6070
Expected annual
$39.2M
One-time setup
$399.8M
Annual recurring
$36.4M
Personnel
32
Initial containment and specialized time-reversal infrastructure drive very large one-time capital costs (~$400M), while recurring operations (Class H dosing, antimemetic consumables, specialized research and monitoring) dominate annual spending (~$36.4M/year). Contingency reserves for catastrophic response or decommissioning are major single-shot budget items.
🏗️ One-Time Capital Costs Total: $399.8M
Initial Research And Lab Setup $130.8M
[#4, #9, #20] Time-reversal infrastructure R&D & installation; Class H production/sterile pharmacy setup; HPC/simulation cluster purchase and secure storage.
Contingency Escalation Reserve $125.0M
[#29] Large capital reserve for catastrophic escalation, cross-site containment, mass amnestic administration and related large-scale emergency responses.
Decommissioning $60.0M
[#17] Contingent costs for time-reversed deactivation and secure disposal / decommissioning procedures.
Facilities $30.0M
[#1] Reinforced, blast- and seismic-isolated vault, excavation, concrete, RF/EMP hardening and radiation shielding for RTGs.
Emergency Response Reserve $27.5M
[#16] Funded, prepositioned destructive capability / demolition capability reserve (standby execution capability).
Equipment $12.0M
[#2, #11] RTG procurement/manufacture + heat-exchanger integration and memetic-resistant sensor suite R&D/deployment (one-time hardware/deployment costs).
Exotic Spare Parts Stockpile $5.5M
[#19] Initial stockpile and replication setup for exotic/irreplaceable components (precision fabrication, spares).
Antimemetic Gear Development And Procurement $4.0M
[#6] Development of Class‑Siddiq antimemetic gear plus initial unit procurement (development + initial units).
Backup Power Equipment $1.2M
[#18] Redundant UPS/generator infrastructure and one-time equipment to interface with RTGs and ancillary systems.
Transport Assets And Retentions $1.2M
[#21] Secure transport assets / vehicle purchase and contract retainer for armored/logistics moves.
Radioactive Waste Setup $1.2M
[#22] Initial setup for radioactive waste handling and long-term storage capability.
Security Equipment $750K
[#15] Up‑front MTF/security equipment, specialized insertion vehicles and gear.
Medical Facility Setup $500K
[#27] One-time setup for medical / bio-containment facility and quarantine suites.
🔄 Annual Recurring Costs Total: $36.4M/yr
Supplies And Consumables $14.8M/yr
[#3, #7, #8, #9] Radioisotope fuel replacement/decay management; antimemetic gear consumables & calibration; continuous Class H dosing for D-Class; Class H production operational consumables.
Research And Monitoring $5.5M/yr
[#5, #30] Operational cost of time-reversal sessions (energy, operators, maintenance) and ongoing fundamental research into memetic filters and anomaly stabilization.
Cover Story And Legal $5.5M/yr
[#24] Ongoing covert PR, legal teams, disinformation and information-control operations to maintain plausible deniability.
Staff Wages $4.3M/yr
[#13, #14, #15] Salaries and benefits for specialist research staff, technical/maintenance staff, and security staffing (annual staffing costs).
Facilities Maintenance $3.9M/yr
[#11, #12, #18, #20, #22, #23] Non-visual sensor calibration & maintenance, backup power fuel/maintenance, HPC maintenance/licensing, radioactive waste monitoring, and environmental monitoring/remediation operations.
Medical Operations $650K/yr
[#27] Ongoing medical operations, long-term monitoring, medications, and bio-containment staffing costs.
Administrative Overhead $500K/yr
[#25] Policy/protocol development, audits, intersite coordination and administrative overhead.
Spare Parts Restocking $500K/yr
[#19] Annual restocking and fabrication for exotic spare parts and replacement components.
Training And Psychological Support $350K/yr
[#26] Staff training, recurring drills, psychological monitoring and support for personnel working under antimemetic/time-reversed conditions.
Classified Archival $300K/yr
[#28] Secure, air-gapped memetic-protected archives and classified records management (non-visual logs).
Logistics And Transport $225K/yr
[#10, #21] D‑Class custody, rotation logistics and per-move transport operation costs.
Cost Scenarios
📊 Baseline (baseline) $36.4M/yr
87.5% probability / year
Normal operational year with no major incidents; routine maintenance, Class H dosing, scheduled time-reversal sessions and research continue as planned.
routine_operations scheduled_testing no_containment_events
🚨 Minor Incident $41.4M/yr
10.0% probability / year +$5.0M vs baseline
Localized equipment failure or small wormhole fluctuation requiring emergency repairs and increased monitoring but no large-scale demolition.
localized_wormhole_fluctuation equipment_failure limited_radiation_leak
🚨 Major Breach $86.4M/yr
2.0% probability / year +$50.0M vs baseline
Partial containment failure requiring MTF deployment, larger repairs, possible site partial-demolition and significant replacement of exotic components.
partial_wormhole_expansion containment_breach sustained_radiological_spill
🚨 Catastrophic Breach $286.4M/yr
0.5% probability / year +$250.0M vs baseline
Catastrophic wormhole failure or imminent uncontrolled expansion forcing site sterilization/deep demolition and full decommissioning procedures.
wormhole_failure imminent_geological_expansion irreversible_containment_loss
👥 Personnel 32 total
Role Count Notes
Research Scientist 10 [#13] Senior physicists/chronobiologists/memeticists responsible for modeling and supervising tests.
Technician / Engineer 9 [#14] On-site mechanical, radiological and systems technicians performing maintenance under protocols.
Security Officer / MTF Agent 8 [#15] Perimeter security and rapid-response MTF staff assigned to site readiness and containment response.
Medical Officer 2 [#27] Medical staff for amnestic administration oversight, radiation treatment and quarantine management.
Administrative Staff 3 [#25] Policy, protocol maintenance, custody administration and liaison roles.
📋 Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a structured estimate; however many items have very wide ranges (R&D, contingency reserves, decommissioning) and scenario likelihoods are subjective, so uncertainty remains significant.
← SCP-6069 ↑ All SCPs SCP-6071 →