SCP-6074
Thaumiel
~
medium confidence
SCP-6074
Expected annual
$6.1M
One-time setup
$2.5M
Annual recurring
$6.0M
Personnel
15
One-time capital upgrades (~$2.49M) dominated by containment, equipment and contingency reserves; recurring annual costs are programmatic operations, MTF operations and research (~$5.99M/yr baseline) with expected annual cost ≈ $6.08M when incident risk is included.
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $6.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.0M/yr
Normal year with program operations, scheduled research and MTF readiness; no major incidents.
routine_operations
scheduled_research
MTF readiness
🚨
Minor Incident
$6.1M/yr
Small accidental contamination, limited public exposure of SCP-6074-1 or an internal protocol breach requiring containment response and limited PR/legal action.
accidental leakage during baking
limited public exposure
minor contamination event
🚨
Major Breach
$7.5M/yr
Significant containment breach or coordinated GOI action resulting in public distribution of SCP-6074-1 or multiple-site compromise requiring large-scale emergency operations, public health response, and extended PR/legal mitigation.
coordinated GOI attack
widespread public distribution
multi-site containment failure
🚨
Major Recovery Operation
$7.0M/yr
Large-scale intelligence and kinetic recovery operation to seize GOI-held SCP-6074 colonies and associated items; expensive multi-month MTF/ops activity.
multi-site recovery operation
high-risk raid
extended MTF deployment
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level 3/6074 Researcher) | 3 | [#10] Senior researchers authorized to create SCP-6074-1; salary & overhead included in staff_wages. |
| Lab Technician | 3 | [#11] Technicians for culture work, sterile baking, instruments; salary & overhead included in staff_wages. |
| Security Officer / On-site Security Supervisor | 9 | [#12] On-site guard coverage (multiple shifts) plus supervisor; aggregated salary & overhead included in staff_wages. |
Confidence Notes
Estimates are built from analyst-provided ranges and midpoints; SCP containment and program costs are reasonably well described but variable (MTF ops, PR incidents, and reserves introduce uncertainty), hence medium confidence.