SCP-6076
Unknown
~
medium confidence
SCP-6076
Expected annual
$3.2M
One-time setup
$5.7M
Annual recurring
$3.1M
Personnel
14
Initial capital/setup is approximately $5.7M driven by site retrofit, turret and R&D purchases; annual operating costs are ~ $3.08M/yr driven by security staffing, MTF readiness, repairs and research. A large one-time emergency reserve (~$2M) is recommended for catastrophic breaches.
One-Time Capital Costs
Total: $5.7M
Annual Recurring Costs
Total: $3.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.1M/yr
Normal uneventful year with routine operations, scheduled research and readiness budgets only.
no breach
routine maintenance
scheduled feedings
🚨
Minor Incident
$3.4M/yr
Localized breach/active period causing limited hardware damage and a single MTF deployment with medevac.
single turret destroyed
one MTF deployment
limited structural/door repairs
🚨
Major Breach
$5.6M/yr
Severe breach with extensive hardware destruction, multiple deployments, casualties, and legal/public exposure costs.
vault door breached
multiple turrets destroyed
mass-casualty and public exposure
🚨
Clandestine Procurement
$3.3M/yr
Operational decision/failure mode where dog meat is sourced clandestinely rather than via cultured substitute, increasing recurring procurement and legal risk costs.
illegal sourcing chosen
increased cover/legal costs
higher per-feeding procurement
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | On-site armed guards and perimeter security included in staff wages [#8]. |
| Remote Monitoring Operator | 2 | Camera/operators and turret operators included in staff wages [#8, #4]. |
| Research Scientist | 2 | Research staff funded within research_and_monitoring budget [#15]. |
| Engineer / Maintenance | 1 | Responsible for structural/technical maintenance, covered partially by facilities_maintenance [#1, #27]. |
| Administrative Staff | 1 | Site admin and liaison support included across cover_story_and_legal and operational budgets [#20]. |
Confidence Notes
Estimates are midpoints from wide ranges provided in analyst notes; many costs depend on policy choices (cultured vs clandestine sourcing), turret quantity/hardening and uncertainty around breach frequency, so moderate confidence.