SCP-6106
Unknown
~
medium confidence
SCP-6106
Expected annual
$4.0M
One-time setup
$6.8M
Annual recurring
$3.9M
Personnel
30
Initial capital expenditure is substantial (~$6.8M) driven by construction of a reinforced isolation chamber, duplication/contingency reserves and specialized equipment; annual operating costs (~$3.9M/yr) are dominated by staffing (CCTV, security, MTF) and ongoing cyber/legal/monitoring activities.
One-Time Capital Costs
Total: $6.8M
Annual Recurring Costs
Total: $3.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.9M/yr
Uneventful year with normal operations and no major incidents.
no containment breaches
routine monitoring and operations
🚨
Minor Incident
$4.1M/yr
Localized incident (single discovery or transport complication) requiring extra MTF response, legal takedowns and overtime.
single-site manifestation
rapid takedown and localized MTF mobilization
🚨
Major Breach
$5.9M/yr
Significant containment failure or multiple victim events requiring emergency mobilization, mass cover-up and accelerated research.
escape from containment
multiple witnessed disappearances
large-scale public exposure
🚨
Political Exposure
$4.9M/yr
Public exposure or legal/political incident requiring heavy PR, settlements and extended legal operations.
public leak
media/political scrutiny
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| CCTV Operator / Supervisor | 12 | [#5] Three operators per shift + one supervisor per shift, 3-shift continuous coverage. |
| Security Officer / Guard | 10 | [#6] 8–12 FTE estimated for 24/7 exclusion enforcement; 10 FTE used for budgeting. |
| Archivist / Librarian (escort) | 2 | [#13] 1–3 additional archival staff or dedicated escorts to enforce two-person rule; 2 FTE used. |
| MTF Agent / Response Team | 6 | [#16] Dedicated capture/transport team; salaries/readiness portion included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most categories allowing medium confidence in estimates; uncertainty remains due to SCP-6106 being currently uncontained, unpredictable manifest frequency on public sites, and site-specific capital reuse assumptions.