SCP-6119
Unknown
~
medium confidence
SCP-6119
Expected annual
$148.6M
One-time setup
$1.7B
Annual recurring
$141.1M
Personnel
254
Estimated one-time capital of approximately $1.67B driven primarily by a continuous perimeter wall, road/access infrastructure, legal/environmental compliance, and decommissioning reserves; recurring annual costs ≈ $141.1M/yr driven by perimeter repairs, MTF payroll, insurance/contingency provisioning, and emergency readiness.
One-Time Capital Costs
Total: $1.7B
Annual Recurring Costs
Total: $141.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$141.1M/yr
Normal operational year with no major breach; recurring maintenance, staffing, monitoring, and contingency provisioning only.
stable_containment
routine_repairs
regular_research_activity
🚨
Minor Incident
$166.1M/yr
Localized breach or heavy-impact event requiring emergency mobilization, localized reconstruction, increased legal/compensation and temporary surge staffing.
localized_breach
perimeter_damage
infrastructure_repairs
🚨
Major Breach
$291.1M/yr
Major breach with extensive infrastructure damage, civilian evacuations/compensation, large-scale reconstruction and extended emergency operations.
large_scale_breach
town_damage_and_evacuations
extended_reconstruction
Personnel
254 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 200 | [#7] MTF Upsilon-83 and rotating perimeter security teams; majority of staff_wages budget allocated here. |
| Research Scientist | 12 | [#8] On-site scientific team positions covered under support personnel recurring costs. |
| Engineer / Maintenance | 10 | [#8] Engineers and maintenance staff for infrastructure, sensors, power and vehicles. |
| Medical Officer | 4 | [#8, #19] On-site medical staff and psychiatric support (recurring medical program funding separate). |
| Technician / Field Operator | 20 | [#8] Field technicians for sensors, unmanned systems and vehicle operations. |
| Administrative Staff | 8 | [#8, #31] Program management, procurement, and administrative support. |
Confidence Notes
Estimates bracketed by wide ranges provided in analyst notes and significant uncertainty about LOC size, frequency/severity of collisions, and legal/environmental costs; many line items use midpoints where specific design/scale is undefined.