SCP-6118
Euclid
~
medium confidence
SCP-6118
Expected annual
$4.5M
One-time setup
$29.4M
Annual recurring
$3.0M
Personnel
14
Initial one-time capital of approximately $29,418,000 driven primarily by BSL‑4 suite construction, countermeasure seed funding and an outbreak contingency reserve; ongoing annual operating costs are approximately $3,048,000/yr driven by staff wages, research/biosurveillance, utilities, and consumables.
One-Time Capital Costs
Total: $29.4M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Normal uneventful year: routine operations, scheduled maintenance, ongoing research at baseline scope.
no_incident
scheduled_maintenance
routine_research
🚨
Minor Incident
$3.5M/yr
Localized equipment failure or minor containment breach requiring repairs, temporary quarantines, overtime and limited medical treatment.
localized_damage
equipment_failure
limited_exposure
🚨
Countermeasure Development
$23.0M/yr
Decision to ramp up countermeasure development to an aggressive, multi-year program (preclinical + early clinical scale-up) requiring substantial annual funding.
no_known_treatment
strategic_decision_to_develop
accelerated_R&D
🚨
Outbreak Response
$103.0M/yr
Containment failure with onward transmission (localized outbreak requiring mass response) leading to large public-health, containment, treatment and legal costs.
breach_and_transmission
community_spread
mass_hospitalizations
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Nursing Staff (RN) | 3 | [#10] 2–4 FTEs indicated for daily IV setup and ongoing clinical care; 3 FTEs used for baseline staffing estimate. |
| Security Officer / MTF Agent | 5 | [#12] 4–6 FTEs recommended for 24/7 coverage; 5 FTEs used. |
| Decontamination Technician | 2 | [#21] 1–3 technicians recommended; 2 FTEs used in baseline. |
| Infectious Disease Physician | 1 | [#11] On-call/oversight specialist time represented as one FTE-equivalent for budgeting purposes. |
| Research Scientist | 1 | [#16] Research lead / scientist to oversee characterization work included in baseline staff costs. |
| Engineer / Maintenance | 1 | [#29] Responsible for HVAC/generator/autoclave maintenance and vendor coordination. |
| Administrative Staff | 1 | [#22] Site/project admin and liaison for legal/comms and procurement. |
Confidence Notes
Line-item estimates are grounded in standard BSL‑4 retrofit, PPE, and medical cost ranges provided in the analyst notes; however large uncertainties remain around countermeasure R&D scope and outbreak-scale impacts, so medium confidence is appropriate.