SCP-6131
Cor
~
medium confidence
SCP-6131
Expected annual
$16.1M
One-time setup
$19.5M
Annual recurring
$15.8M
Personnel
17
Estimated one-time setup costs are roughly $19.46M (facility buildouts, remote blacksite, engineering/transport, and contingency reserves); steady-state annual operating costs are ~ $15.795M/yr driven primarily by highly paid containment staff, ongoing research/monitoring, and blacksite/maintenance ops.
One-Time Capital Costs
Total: $19.5M
Annual Recurring Costs
Total: $15.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.8M/yr
Normal year with regular rituals/containment activity and no major uncontrolled incidents.
routine Protocol Load-Barer activations
scheduled research and maintenance
🚨
Minor Incident
$16.3M/yr
A single-year minor escalation: ritual activation leads to small controlled arson, an evacuation day, additional amnestic usage, and minor property/repair costs.
single ritual with controlled arson
extra evacuation and replacement/research costs
🚨
Major Property Damage
$25.8M/yr
Uncontrolled fire or spread into lab wings causing multi-million property damage and major repair/cleanup operations.
arson spreads beyond sacrificial room
large-scale structural damage and equipment loss
🚨
Second Phase Escalation
$35.8M/yr
Protocols fail and second-phase measures are required (mass amnestic programs, creation/classification of new SCP, relocation or large-scale second-phase operations).
failure of daily rituals to control SCP-6131-1
decision to escalate to second-phase Protocol Load-Barer
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#1] Dedicated 5/6131 operators (senior containment officers/oculomancers/psych officers) salaried and continuously available. |
| Research Scientist | 4 | [#5, #7, #22] Specialists in memetics/neuromodulation and research staff for ongoing studies and monitoring. |
| IT Specialist / Forensic Admin | 3 | [#8, #4] Trusted forensic/admin team for selective surveillance erasure, hardened servers, and electronics-control procedures. |
| Medical Officer | 2 | [#6, #13] Medical staff to administer amnestics, monitor neurological biomarkers, and provide occupational health services. |
| Engineer / Maintenance | 2 | [#14, #3] Structural/transport engineers and maintenance staff for heavy engineering, safe-room life-support, and facility upkeep. |
| Administrative Staff | 1 | [#12, #16] Admin/liaison for evacuation coordination, PR/legal liaison scheduling, and cover-story management. |
Confidence Notes
Analyst notes provide detailed line items and plausible ranges, but many estimates are wide (amnestics, blacksite scale, and catastrophic event costs). The anomalous, memetic nature of SCP-6131 and the range of episodic outcomes produce moderate uncertainty.