SCP-6134
Thaumiel-Provisi
~
medium confidence
SCP-6134
Expected annual
$2.0M
One-time setup
$3.1M
Annual recurring
$2.0M
Personnel
11
One-time capital and salvage/retrofit work dominates costs (drainage retrofit, CT purchase, salvage), with recurring personnel (security + scientific staff), maritime denial and program contingency as the main annual drivers.
One-Time Capital Costs
Total: $3.1M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal year with no major incidents; all systems operational and routine maintenance only.
routine_maintenance
no_leaks_or_breaches
🚨
Minor Incident
$2.0M/yr
Localized equipment failure or small containment leak requiring repair, limited cleanup and temporary overtime.
pump_or_valve_failure
small_saline_leak
sensor_alarm_trigger
🚨
Major Breach
$2.9M/yr
Significant containment failure or large uncontrolled flow of SCP-6134-C, requiring emergency contractors, extended repairs, potential legal response and remediation.
catastrophic_pump_system_failure
structural_floor_breach
large_uncontrolled_salinity_release
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] 24/7 coverage: six guards on rotating shifts (base estimate). |
| Security Supervisor | 1 | [#9] Supervisor/shift lead to coordinate security coverage. |
| Research Scientist (Pathologist) | 1 | [#10] Senior pathologist responsible for examinations and oversight. |
| Containment Specialist / Lead | 1 | [#10] Containment lead for procedural oversight and anomaly response. |
| Research Technician | 2 | [#10] Technical support for monitoring, sample handling and equipment operation. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling mid-range estimates; uncertainty remains due to multiple optional approaches (CT purchase vs contract scans, one-time vs recurring contingency) and unknown long-term maritime posture, so medium confidence is appropriate.