SCP-6133
Unknown
~
medium confidence
SCP-6133
Expected annual
$2.1M
One-time setup
$7.6M
Annual recurring
$2.1M
Personnel
24
Initial capital is dominated by the purchase/condemnation of the shipyard property (~$5.0M); recurring annual costs (~$2.07M/yr) are driven primarily by staff wages, ongoing research/monitoring, and cover/legal expenses.
One-Time Capital Costs
Total: $7.6M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal, uneventful year with routine monitoring, maintenance, and scheduled operations.
no incidents
regular maintenance
scheduled research activity
🚨
Minor Incident
$2.3M/yr
Localized containment event (e.g., unexpected manifestation causing a single response, evidence disposal and emergency repairs).
single exposed manifestation requiring response
contractor disposal and overtime
minor repairs and legal payouts
🚨
Major Breach
$4.2M/yr
Significant escalation requiring emergency property acquisition, upgraded containment (possible BSL-3), large-scale decontamination and legal action.
significant containment breach
biological hazard confirmed
forced expansion or emergency relocation
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (plainclothes) | 9 | [#3] 9 operatives for continuous covert coverage as specified in notes. |
| Security / Rapid-response (maritime-capable) | 8 | [#4, #5, #6] Armed rapid-response maritime-capable team (6–9 personnel noted; 8 used here) to operate boats and perform emergency extraction. |
| Research Scientist | 2 | [#12] Two senior researchers recommended for observation and analysis. |
| Research Technician | 1 | [#12] One technician to support data collection and instrument maintenance. |
| Medical Officer | 1 | [#13] Medical screening, monitoring and counseling oversight. |
| Administrative Staff | 2 | [#24] Accounting, payroll, background checks and front-company administration. |
| Site Director / Executive Staff | 1 | [overall] Single site lead to coordinate security, research and cover operations. |
Confidence Notes
Analyst notes provide detailed line-item estimates, but uncertainty remains around property valuation variance, frequency/severity of anomalous incidents, and whether BSL-3 or expanded containment will be required; therefore confidence is medium.