SCP-616
Keter
?
low confidence
SCP-616
Expected annual
$61.0M
One-time setup
$6.3B
Annual recurring
$56.9M
Personnel
43
One-time capital and contingency costs are dominated by hardened facility construction and nuclear acquisition/contingency reserves (~$6.28B total one-time). Recurring annual operations are substantial due to clergy logistics, nuclear custody, security, research and staff wages (~$56.87M/yr).
One-Time Capital Costs
Total: $6.3B
Annual Recurring Costs
Total: $56.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$56.9M/yr
Normal year with monthly flights, routine maintenance, security, clergy logistics, nuclear custody operations but no major incidents.
monthly_manned_flights
routine_maintenance
regular_clergy_visits
🚨
Minor Incident
$76.9M/yr
Localized breach or security incident (non-nuclear) requiring emergency response, repairs, legal costs and limited remediation.
site_security_breach
aircraft_damage_or_unplanned_repair
limited_public_exposure
🚨
Nuclear Catastrophic Event
$6.0B/yr
Invocation or accidental detonation/major release scenario requiring full contingency fund deployment, large-scale evacuation and multi-year remediation.
procedure_600_Shoki_invoked
nuclear_detonation_or_massive_release
Personnel
43 total
| Role | Count | Notes |
|---|---|---|
| Pilot / Flight Operations | 3 | [#6] One primary Foundation pilot plus flight operations/dispatch staff (pilot + 2 ops). |
| Maintenance Crew / Technicians | 4 | [#7] Level-2+ avionics and structural technicians (midpoint of 3–6). |
| Security Officer / MTF Agent | 25 | [#8] 24/7 armed security multi-shift staffing estimated from security budget midpoint. |
| Medical Officer | 2 | [#15] On-flight medic coverage plus on-site ER backup (small team). |
| Psychological / Mental-Health Clinician | 3 | [#16] 2–3 clinicians for longitudinal care and evaluations (midpoint 3). |
| Research Scientist / Linguist / Theological Liaison | 6 | [#19] Small multidisciplinary research team (midpoint of 4–8 researchers). |
Confidence Notes
Large ranges, political/impossible costs (nuclear procurement), and contingency magnitudes create high uncertainty; many estimates are midpoints of wide ranges and depend on classified/political variables.