SCP-6201
Keter
~
medium confidence
SCP-6201
Expected annual
$38.1M
One-time setup
$125.0M
Annual recurring
$37.5M
Personnel
85
One-time capital costs are dominated by a hardened Scandinavian containment site, aviation assets, and research/countermeasure R&D (~$125M). Recurring annual costs (~$37.5M/yr) are driven by security and research staff, monitoring/analysis, PR/legal cover, and large discretionary contingency funds.
One-Time Capital Costs
Total: $125.0M
Annual Recurring Costs
Total: $37.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$37.5M/yr
Normal year with routine monitoring, staffing, and programmatic expenditures and no major incidents.
no major breaches
routine monitoring and maintenance
🚨
Minor Incident
$40.8M/yr
Localized manipulation event requiring targeted repair, extra field response and PR/legal mitigation.
localized geological damage
temporary public exposure
extra rapid-response deployments
🚨
Major Breach
$62.0M/yr
Large-scale, multi-site manipulation causing significant infrastructure damage, public exposure, and triggering accelerated R&D and large coverup operations.
multi-site geological manipulation
extensive civilian infrastructure damage
major public/political exposure
Personnel
85 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 60 | [#7] 24/7 armed and technical security staff for a medium site (60 guards used in wage estimate). |
| Research Scientist | 15 | [#8] Senior specialists (biologists, geologists, ethologists, thaumaturgy) reflected in the $1,800,000/yr component. |
| Technician / Postdoc | 10 | [#8] Postdocs and technical staff covered by the ~$700,000/yr component (approx. 10 techs at ~70k average). |
Confidence Notes
Analyst notes provide many explicit estimates and midpoints, enabling a structured budget, but the entity's anomalous and unpredictable influence on geology, and discretionary black-budget items, introduce material uncertainty; hence medium confidence.