SCP-6202
Unknown
~
medium confidence
SCP-6202
Expected annual
$2.7M
One-time setup
$3.2M
Annual recurring
$2.6M
Personnel
21
Initial (one-time) setup and contingencies are estimated at approximately $3.22M, driven by property acquisition, structural sealing/retrofit, decommissioning contingency and specialized lab/setup. Annual operations are expected to run roughly $2.60M/yr, driven primarily by staff wages (security, containment crew, research), ongoing R&D, medical/surgical standby and administrative overhead.
One-Time Capital Costs
Total: $3.2M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal year with no major incidents; regular operations, scheduled research and occasional small consumable replacements.
no significant exposures
scheduled R&D and maintenance
🚨
Minor Incident
$2.7M/yr
Single-significant exposure or containment uptick requiring additional PPE replacement, deep cleaning and limited additional surgical interventions.
single significant exposure
localized contamination requiring deep cleaning
one or two additional surgical removals
🚨
Major Breach
$4.7M/yr
Large-scale containment failure or exposure requiring emergency mobilization, extensive incineration/remediation or site demolition and mass response.
mass infection event
failed organ removal escalation
public exposure necessitating demolition/remediation
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Cleaning/Containment Crew | 4 | Specialized hazmat cleaning team (rotation), salaries included in staff_wages [#8]. |
| Security Officer / MTF Agent | 12 | 24/7 multi-shift armed security coverage; salaries included in staff_wages [#9]. |
| Research Scientist | 4 | Bench scientists (pathology, microbiology, genomics); salary pool included in staff_wages [#12]. |
| Principal Investigator | 1 | PI/lead researcher overseeing programs; salary included in staff_wages [#12]. |
Confidence Notes
Estimates use midpoints of provided ranges and explicit analyst figures where available. Uncertainty remains in incident frequency, required R&D budget, and extent of possible decommissioning; anomalous regenerative behavior and per-incident costs are hard to predict.