SCP-6366
Unknown
~
medium confidence
SCP-6366
Expected annual
$904K
One-time setup
$989K
Annual recurring
$893K
Personnel
9
One-time capital/setup is approximately $989,000 driven by aviary construction, structural mitigation and research instrumentation; annual recurring operating costs are approximately $893,000/yr driven primarily by staff wages (animal care + security), insurance/overhead, and ongoing research and veterinary support.
One-Time Capital Costs
Total: $989K
Annual Recurring Costs
Total: $893K/yr
Cost Scenarios
📊
Baseline
(baseline)
$893K/yr
Normal year with routine operations, no major incidents.
routine feeding and enrichment
scheduled research and maintenance
🚨
Minor Incident
$908K/yr
Small containment event requiring overtime, minor repairs, and limited medical treatment.
temporary separation alarm response
minor structural or equipment damage
overtime and emergency veterinary visit
🚨
Major Breach
$1.1M/yr
Containment breach with property damage, emergency surgical rescue and significant repairs/PR response.
security breach or major power failure
entity trans-phase through structures causing damage
surgical rescue or extended medical treatment
🚨
Catastrophic Breach
$1.9M/yr
Severe multi-area structural failure or public exposure requiring large-scale recovery, replacements and settlements.
major anomalous pull causes wide structural collapse
public exposure or large liability event
multi-unit recovery and replacement
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Animal Keeper / Senior Keeper | 1 | [#9] Full-time senior keeper (avian experience) as noted in analyst notes. |
| Animal Keeper / Technician | 2 | [#9] Two technicians experienced with exotic/piscine species for daily feeding, handling and monitoring. |
| Security Officer / MTF Agent | 6 | [#11] Six guards for 24/7 coverage across three shifts as specified in analyst notes. |
Confidence Notes
Estimates are midpoint selections from provided ranges; costs are fairly well scoped by containment needs but still subject to local construction/labor variance, vendor quotes, and uncertain incident frequencies.